IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
SIC 2013 Sausages And Other Prepared Meats
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0074 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $272 $600 Not Implemented
SF0074 # 03 Y:1995 03 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,044 $262 Implemented
SF0074 # 02 Y:1995 02 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $8,747 $5,369 Not Implemented
SF0074 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,480 $1,158 Not Implemented
SF0074 # 09 Y:1995 09 1995 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $387 $25 Implemented
SF0074 # 07 Y:1995 07 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,143 $2,542 Not Implemented
SF0074 # 08 Y:1995 08 1995 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,174 $150 Implemented
SF0074 # 06 Y:1995 06 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $685 $75 Not Implemented
SF0074 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $648 $0 Implemented
SF0074 # 10 Y:1995 10 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $554 $0 Implemented
UM0026 # 04 Y:1995 04 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $443 $451 Not Implemented
UM0026 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,265 $5,362 Implemented
UM0026 # 03 Y:1995 03 1995 INSTALL AUTOMATIC STACK DAMPER $855 $500 Not Implemented
UM0026 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $215 $305 Implemented
AM0233 # 02 Y:1995 02 1995 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,300 $0 Not Implemented
AM0233 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $195 $0 Not Implemented
AM0233 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,370 $1,400 Implemented
AM0233 # 03 Y:1995 03 1995 USE SYNTHETIC LUBRICANT $2,120 $0 Not Implemented
AM0233 # 01 Y:1995 01 1995 REPAIR AND ELIMINATE STEAM LEAKS $9,000 $90 Implemented
OK0463 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,526 $19,716 Implemented
OK0463 # 07 Y:1995 07 1995 USE OTHER WASTE CONCENTRATION METHODS $25,799 $50,000 Implemented
OK0463 # 05 Y:1995 05 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $3,357 $1,535 Implemented
OK0463 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $941 $1,315 Not Implemented
OK0463 # 03 Y:1995 03 1995 UPGRADE CONTROLS ON COMPRESSORS $4,172 $2,500 Not Implemented
OK0463 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,020 $3,000 Implemented