Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsSIC | 2013 | Sausages And Other Prepared Meats |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0345 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,969 | $3,100 | Implemented |
MI0345 # 02 Y:2018 | 02 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,837 | $3,204 | Implemented |
MI0345 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,576 | $3,443 | Implemented |
MI0345 # 04 Y:2018 | 04 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,410 | $1,982 | Not Implemented |
MI0345 # 05 Y:2018 | 05 | 2018 | INSTALL OCCUPANCY SENSORS | $1,380 | $540 | Implemented |
MI0345 # 06 Y:2018 | 06 | 2018 | USE SOLAR HEAT TO HEAT WATER | $1,166 | $2,755 | Implemented |
MI0345 # 07 Y:2018 | 07 | 2018 | OPTIMIZE PLANT POWER FACTOR | $810 | $2,138 | Not Implemented |
MI0345 # 08 Y:2018 | 08 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $785 | $1,560 | Not Implemented |
LS1809 # 05 Y:2018 | 05 | 2018 | INSULATE BARE EQUIPMENT | $364 | $440 | Not Implemented |
BS0111 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,853 | $2,250 | Implemented |
LS1809 # 07 Y:2018 | 07 | 2018 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,145 | $11,000 | Not Implemented |
LS1809 # 06 Y:2018 | 06 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $33 | $50 | Not Implemented |
LS1809 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,902 | $4,019 | Not Implemented |
LS1809 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $401 | $300 | Not Implemented |
LS1809 # 02 Y:2018 | 02 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $134 | $45 | Not Implemented |
LS1809 # 01 Y:2018 | 01 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,090 | $100 | Not Implemented |
BS0111 # 07 Y:2018 | 07 | 2018 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $130,754 | $100,744 | Not Implemented |
BS0111 # 06 Y:2018 | 06 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,713 | $20 | Implemented |
BS0111 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,250 | $60 | Implemented |
BS0111 # 04 Y:2018 | 04 | 2018 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $10,878 | $1,225 | Implemented |
BS0111 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,707 | $2,970 | Implemented |
BS0111 # 02 Y:2018 | 02 | 2018 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $768 | $1,485 | Implemented |
MI0329 # 11 Y:2018 | 11 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $535 | $40 | Implemented |
MI0329 # 09 Y:2018 | 09 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,990 | $4,250 | Not Implemented |
MI0329 # 10 Y:2018 | 10 | 2018 | INSTALL OCCUPANCY SENSORS | $2,804 | $1,060 | Implemented |