IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

718

matching recommendations
Reset
SIC 2015 Poultry Slaughtering And Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0791 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $5,322 $2,727 n/a
GT0791 # 05 Y:2004 05 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $74,318 $31,600 n/a
GT0791 # 06 Y:2004 06 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $605 $800 n/a
GT0791 # 07 Y:2004 07 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $10,622 $17,600 n/a
GT0791 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $607 $1,112 n/a
GT0791 # 09 Y:2004 09 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,041 $18,139 n/a
GT0791 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,680 $6,882 n/a
GT0791 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,540 $14,700 n/a
OK0670 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,939 $27,543 Not Implemented
OK0670 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,120 $0 Implemented
OK0670 # 03 Y:2003 03 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $12,292 $0 Implemented
OK0670 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $26,304 $4,211 Not Implemented
OK0670 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,797 $113,450 Not Implemented
OK0670 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $1,771 $1,017 Not Implemented
OK0670 # 07 Y:2003 07 2003 INSTALL AUTOMATIC PACKING EQUIPMENT $58,240 $6,500 Not Implemented
SU0164 # 01 Y:2003 01 2003 INSTALL WIND POWERED ELECTRIC GENERATOR $141,258 $1,171,875 Not Implemented
SU0164 # 02 Y:2003 02 2003 USE OPTIMUM THICKNESS INSULATION $115,419 $348,540 Implemented
SU0164 # 03 Y:2003 03 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $30,000 $76,518 Not Implemented
SU0164 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,096 $55,580 Implemented
SU0164 # 05 Y:2003 05 2003 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $8,721 $0 Implemented
SU0164 # 06 Y:2003 06 2003 INSTALL WIND POWERED ELECTRIC GENERATOR $7,910 $10,000 Not Implemented
SU0164 # 07 Y:2003 07 2003 REDESIGN PROCESS $6,861 $270 Implemented
SU0164 # 08 Y:2003 08 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,485 $700 Implemented
SU0164 # 09 Y:2003 09 2003 INCREASE AMOUNT OF CONDENSATE RETURNED $1,293 $955 Implemented
SU0164 # 10 Y:2003 10 2003 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $847 $1,744 Implemented