Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
80
matching recommendationsSIC | 2015 | Poultry Slaughtering And Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0827 # 10 Y:2006 | 10 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,887 | $3,400 | Implemented |
GT0827 # 01 Y:2006 | 01 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,551 | $1,487 | Not Implemented |
GT0827 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $325,944 | $38,000 | Not Implemented |
GT0827 # 03 Y:2006 | 03 | 2006 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $85,490 | $12,500 | Not Implemented |
GT0827 # 04 Y:2006 | 04 | 2006 | REDUCE EXCESS STEAM BLEEDING | $10,400 | $39,900 | Not Implemented |
GT0827 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,421 | $4,053 | Implemented |
GT0827 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,361 | $2,328 | Implemented |
GT0827 # 07 Y:2006 | 07 | 2006 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $2,734 | $3,500 | Not Implemented |
GT0827 # 08 Y:2006 | 08 | 2006 | METER WASTE WATER | $81,583 | $5,250 | Implemented |
GT0827 # 09 Y:2006 | 09 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $158,948 | $150,000 | Implemented |
MS0303 # 04 Y:2006 | 04 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,457 | $1,500 | Implemented |
MS0303 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $42,224 | $161,070 | Implemented |
MS0303 # 02 Y:2006 | 02 | 2006 | HEAT WATER WITH EXHAUST HEAT | $9,180 | $27,946 | Not Implemented |
MS0303 # 03 Y:2006 | 03 | 2006 | BURN WASTE OIL FOR HEAT | $3,804 | $2,186 | Implemented |
LL0257 # 01 Y:2006 | 01 | 2006 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $501,312 | $98,000 | Not Implemented |
LL0257 # 09 Y:2006 | 09 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,389 | $90 | Not Implemented |
LL0257 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $889 | $700 | Not Implemented |
LL0257 # 06 Y:2006 | 06 | 2006 | INSULATE BARE EQUIPMENT | $5,404 | $5,120 | Not Implemented |
LL0257 # 10 Y:2006 | 10 | 2006 | INSTALL OCCUPANCY SENSORS | $182 | $420 | Not Implemented |
LL0257 # 05 Y:2006 | 05 | 2006 | REDUCE EXCESSIVE BOILER BLOWDOWN | $10,380 | $18,000 | Not Implemented |
LL0257 # 04 Y:2006 | 04 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,875 | $810 | Not Implemented |
LL0257 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,217 | $7,960 | Not Implemented |
LL0257 # 02 Y:2006 | 02 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $302,971 | $5,510 | Not Implemented |
LL0257 # 07 Y:2006 | 07 | 2006 | USE PHOTOCELL CONTROLS | $2,433 | $450 | Not Implemented |
LL0256 # 08 Y:2006 | 08 | 2006 | INSTALL OCCUPANCY SENSORS | $2,768 | $210 | Not Implemented |