Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

508

matching recommendations
Reset
SIC 2015 Poultry Slaughtering And Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0789 # 11 Y:2010 11 2010 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $997 $1,486 Implemented
OK0789 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $80,818 $182,391 Not Implemented
OK0789 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $384 $1,579 Not Implemented
OK0789 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,970 $31,888 Implemented
OK0789 # 07 Y:2010 07 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,330 $17,280 Not Implemented
OK0789 # 10 Y:2010 10 2010 USE POWER DURING OFF-PEAK PERIODS $34,743 $99,978 Not Implemented
OK0789 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,476 $144,256 Not Implemented
OK0789 # 08 Y:2010 08 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $827 $896 Implemented
OK0789 # 09 Y:2010 09 2010 INSULATE BARE EQUIPMENT $10,734 $5,136 Not Implemented
OK0789 # 06 Y:2010 06 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,798 $7,980 Implemented
OK0789 # 02 Y:2010 02 2010 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $20,004 $15,450 Not Implemented
SF0364 # 03 Y:2008 03 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,974 $913 Implemented
SF0364 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,557 $10,440 Not Implemented
SF0364 # 09 Y:2008 09 2008 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $9,060 $11,740 Implemented
SF0364 # 13 Y:2008 13 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,296 $2,489 Implemented
SF0364 # 04 Y:2008 04 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,655 $798 Implemented
SF0364 # 11 Y:2008 11 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $409 $801 Implemented
SF0364 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $4,350 $2,680 Not Implemented
SF0364 # 02 Y:2008 02 2008 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $4,812 $1,046 Implemented
SF0364 # 06 Y:2008 06 2008 BURN A LESS EXPENSIVE GRADE OF FUEL $85,730 $61,250 Implemented
SF0364 # 12 Y:2008 12 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,909 $2,854 Implemented
SF0364 # 14 Y:2008 14 2008 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $63,306 $125,074 Implemented
SF0364 # 10 Y:2008 10 2008 REDUCE EXCESSIVE BOILER BLOWDOWN $6,734 $8,900 Implemented
SF0364 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,446 $0 Implemented
SF0364 # 08 Y:2008 08 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,316 $22,812 Not Implemented