IAC Assessment: OK0789
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0789
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2010
Principal Product Poultry Processing and Packaging
NAICS 311615 - Poultry Processing
SIC 2015 - Poultry Slaughtering And Processing
Sales $100,000,000-$500,000,000
# of Employees 100
Plant Area (Sq.Ft.) 116,000
Annual Production 112,000,000 Pieces
Production Hrs. Annual 4,160
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,560,589 24,772,800 kWh $0.06
Electricity Demand $341,721 56,588 kW-months/year $6.04
Natural Gas $859,781 183,413 MMBtu $4.69
TOTAL ENERGY COSTS $3,782,505
RECOMMENDED SAVINGS* $201,081 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,592
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$80,818
Cost:
$182,391
- - $80,818 14,984 -
-
kWh
$80,818
14,984
MMBtu
02: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$20,004
Cost:
$15,450
$20,004 318,036 - - $20,004
318,036
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,970
Cost:
$31,888
$7,970 126,703 - - $7,970
126,703
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,476
Cost:
$144,256
$13,476 214,250 - - $13,476
214,250
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$384
Cost:
$1,579
$384 6,098 - - $384
6,098
kWh
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,798
Cost:
$7,980
$7,798 127,164 - - $7,798
127,164
kWh
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$23,330
Cost:
$17,280
$23,330 370,913 - - $23,330
370,913
kWh
-
-
MMBtu
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$827
Cost:
$896
- - $827 176 -
-
kWh
$827
176
MMBtu
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$10,734
Cost:
$5,136
$10,734 170,654 - - $10,734
170,654
kWh
-
-
MMBtu
10: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$34,743
Cost:
$99,978
$34,743 273,575 - - $34,743
273,575
kWh
-
-
MMBtu
11: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$997
Cost:
$1,486
$997 - - - $997
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$201,081
Cost:
$508,320
$119,436 1,607,393 $81,645 15,160 $119,436
1,607,393
kWh
$81,645
15,160
MMBtu
TOTAL IMPLEMENTED Savings:
$17,592
Cost:
$42,250
$16,765 253,867 $827 176 $16,765
253,867
kWh
$827
176
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas