IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0122 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $396 $642 Implemented
AR0122 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,490 $220 Implemented
AR0122 # 04 Y:1997 04 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,860 $1,000 Implemented
AR0122 # 06 Y:1997 06 1997 RECOVER AND REUSE COOLING WATER $5,497 $4,200 Implemented
AR0122 # 07 Y:1997 07 1997 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $584 $100 Implemented
AR0122 # 08 Y:1997 08 1997 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,518 $325 Implemented
TN0265 # 01 Y:1985 01 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $7,706 $2,000 Implemented
TN0265 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,904 $320 Implemented
TN0265 # 03 Y:1985 03 1985 USE MINIMUM STEAM OPERATING PRESSURE $3,947 $0 Implemented
TN0265 # 04 Y:1985 04 1985 REPAIR AND ELIMINATE STEAM LEAKS $1,386 $75 Implemented
TN0265 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,474 $7,430 Implemented
TN0265 # 06 Y:1985 06 1985 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $896 $115 Implemented
TN0265 # 07 Y:1985 07 1985 INSTALL SET-BACK TIMERS $498 $0 Implemented
TN0177 # 02 Y:1983 02 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,540 $400 Implemented
TN0177 # 03 Y:1983 03 1983 USE MINIMUM STEAM OPERATING PRESSURE $2,625 $400 Implemented