Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Tennessee |
---|---|
Assessment Year | 1985 |
Principal Product | CHEESE |
NAICS | n/a |
SIC | 2022 - Cheese, Natural And Processed |
Sales | $10,000,000-$50,000,000 |
# of Employees | 34 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 10,000,000 Pounds |
Production Hrs. Annual | 8,736 |
Location (State) | TN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $80,810 | 1,662,954 | kWh | $0.05 |
Natural Gas | $145,402 | 30,629 | MMBtu | $4.75 |
Fuel Oil #2 | $3,170 | 462 | MMBtu | $6.86 |
TOTAL ENERGY COSTS | $229,382 | |||
RECOMMENDED SAVINGS* | $27,811 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $27,811 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #2 | Electricity Usage | Natural Gas | Fuel Oil #2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $7,706 Cost: $2,000 |
- | - | $7,706 | 1,626 | - | - |
- - kWh |
$7,706 1,626 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $8,904 Cost: $320 |
- | - | $8,712 | 1,838 | $192 | 28 |
- - kWh |
$8,712 1,838 MMBtu |
$192 28 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $3,947 Cost: - |
- | - | $3,858 | 814 | $89 | 13 |
- - kWh |
$3,858 814 MMBtu |
$89 13 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $1,386 Cost: $75 |
- | - | $1,356 | 286 | $30 | 4 |
- - kWh |
$1,356 286 MMBtu |
$30 4 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,474 Cost: $7,430 |
$4,474 | 93,200 | - | - | - | - |
$4,474 93,200 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $896 Cost: $115 |
- | - | $876 | 185 | $20 | 3 |
- - kWh |
$876 185 MMBtu |
$20 3 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $498 Cost: - |
$498 | 10,258 | - | - | - | - |
$498 10,258 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,811 Cost: $9,940 |
$4,972 | 103,458 | $22,508 | 4,749 | $331 | 48 | $4,972 103,458 kWh |
$22,508 4,749 MMBtu |
$331 48 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $27,811 Cost: $9,940 |
$4,972 | 103,458 | $22,508 | 4,749 | $331 | 48 | $4,972 103,458 kWh |
$22,508 4,749 MMBtu |
$331 48 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #2 | Electricity Usage | Natural Gas | Fuel Oil #2 |