IAC Assessment: TN0265
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0265
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1985
Principal Product CHEESE
NAICS n/a
SIC 2022 - Cheese, Natural And Processed
Sales $10,000,000-$50,000,000
# of Employees 34
Plant Area (Sq.Ft.) 0
Annual Production 10,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,810 1,662,954 kWh $0.05
Natural Gas $145,402 30,629 MMBtu $4.75
Fuel Oil #2 $3,170 462 MMBtu $6.86
TOTAL ENERGY COSTS $229,382
RECOMMENDED SAVINGS* $27,811 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,811
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$7,706
Cost:
$2,000
- - $7,706 1,626 - - -
-
kWh
$7,706
1,626
MMBtu
-
-
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$8,904
Cost:
$320
- - $8,712 1,838 $192 28 -
-
kWh
$8,712
1,838
MMBtu
$192
28
MMBtu
03: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$3,947
Cost:
-
- - $3,858 814 $89 13 -
-
kWh
$3,858
814
MMBtu
$89
13
MMBtu
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,386
Cost:
$75
- - $1,356 286 $30 4 -
-
kWh
$1,356
286
MMBtu
$30
4
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,474
Cost:
$7,430
$4,474 93,200 - - - - $4,474
93,200
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$896
Cost:
$115
- - $876 185 $20 3 -
-
kWh
$876
185
MMBtu
$20
3
MMBtu
07: 2.6232 INSTALL SET-BACK TIMERS Savings:
$498
Cost:
-
$498 10,258 - - - - $498
10,258
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$27,811
Cost:
$9,940
$4,972 103,458 $22,508 4,749 $331 48 $4,972
103,458
kWh
$22,508
4,749
MMBtu
$331
48
MMBtu
TOTAL IMPLEMENTED Savings:
$27,811
Cost:
$9,940
$4,972 103,458 $22,508 4,749 $331 48 $4,972
103,458
kWh
$22,508
4,749
MMBtu
$331
48
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2