IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,773

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0089 # 02 Y:2016 02 2016 USE PHOTOCELL CONTROLS $628 $290 Not Implemented
WM0089 # 03 Y:2016 03 2016 INCREASE USE OF AUTOMATION $52,696 $6,000 Not Implemented
WM0089 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,394 $0 Not Implemented
WM0089 # 05 Y:2016 05 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $11,093 $0 Not Implemented
WM0089 # 06 Y:2016 06 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $392 $690 Not Implemented
BS0070 # 01 Y:2016 01 2016 REPAIR OR REPLACE STEAM TRAPS $13,590 $12,584 Implemented
BS0070 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,026 $744 Implemented
BS0070 # 03 Y:2016 03 2016 PAY UTILITY BILLS ON TIME $2,153 $213 Implemented
BS0070 # 04 Y:2016 04 2016 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $1,079 $4,500 Implemented
BS0070 # 05 Y:2016 05 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $418 $14 Implemented
BS0070 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $220 $585 Implemented
BS0070 # 07 Y:2016 07 2016 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $161 $43 Implemented
BS0070 # 08 Y:2016 08 2016 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $9,918 $88,300 Not Implemented
UD0938 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $39,463 $0 Not Implemented
UD0938 # 02 Y:2015 02 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,298 $0 Implemented
UD0938 # 03 Y:2015 03 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,403 $0 Not Implemented
UD0938 # 04 Y:2015 04 2015 UPGRADE CONTROLS ON COMPRESSORS $107,431 $0 Not Implemented
UD0938 # 05 Y:2015 05 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $29,938 $3,000 Not Implemented
UD0938 # 06 Y:2015 06 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,415 $0 Implemented
UD0938 # 07 Y:2015 07 2015 DEVELOP A REPAIR/REPLACE POLICY $152 $530 Implemented
UD0938 # 08 Y:2015 08 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,596 $20,100 Not Implemented
UD0938 # 09 Y:2015 09 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $807 $3,133 Not Implemented
UD0938 # 10 Y:2015 10 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,880 $15,000 Not Implemented
UD0938 # 11 Y:2015 11 2015 MINIMIZE WATER USAGE $27,153 $9,300 Not Implemented
UK1511 # 01 Y:2015 01 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $457,639 $1,000,000 Implemented