Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
276
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0520 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,296 | $8,179 | Implemented |
SF0520 # 06 Y:2018 | 06 | 2018 | INSTALL OCCUPANCY SENSORS | $942 | $900 | Implemented |
SF0520 # 07 Y:2018 | 07 | 2018 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $17,938 | $24,858 | Implemented |
SF0520 # 08 Y:2018 | 08 | 2018 | USE SOLAR HEAT TO MAKE ELECTRICTY | $82,569 | $631,513 | Not Implemented |
SF0520 # 09 Y:2018 | 09 | 2018 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,289 | $953 | Implemented |
SF0520 # 01 Y:2018 | 01 | 2018 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $3,418 | $136 | Not Implemented |
SF0520 # 02 Y:2018 | 02 | 2018 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $7,652 | $800 | Implemented |
SF0520 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,563 | $136 | Implemented |
SF0519 # 09 Y:2018 | 09 | 2018 | RECYCLE WHITE WATER | $16,021 | $7,759 | Not Implemented |
SF0519 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,215 | $160 | Not Implemented |
SF0519 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,309 | $55,280 | Not Implemented |
SF0519 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $9,168 | $23,469 | Implemented |
SF0519 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,990 | $19,331 | Not Implemented |
SF0519 # 04 Y:2018 | 04 | 2018 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,597 | $2,408 | Not Implemented |
SF0519 # 03 Y:2018 | 03 | 2018 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $29,348 | $20,000 | Not Implemented |
SF0519 # 02 Y:2018 | 02 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $376 | $120 | Not Implemented |
SF0519 # 08 Y:2018 | 08 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,974 | $34,820 | Not Implemented |
SF0516 # 01 Y:2018 | 01 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,768 | $350 | Implemented |
SF0516 # 11 Y:2018 | 11 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,207 | $7,506 | Implemented |
SF0516 # 12 Y:2018 | 12 | 2018 | REPLACE BOILER | $110,920 | $948,704 | Not Implemented |
SF0516 # 13 Y:2018 | 13 | 2018 | RECYCLE WHITE WATER | $55,700 | $17,768 | Not Implemented |
SF0516 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,647 | $300 | Implemented |
SF0516 # 10 Y:2018 | 10 | 2018 | INCREASE AMOUNT OF CONDENSATE RETURNED | $17,989 | $48,803 | Not Implemented |
SF0516 # 07 Y:2018 | 07 | 2018 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $32,827 | $20,000 | Implemented |
SF0516 # 08 Y:2018 | 08 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $28,367 | $15,956 | Implemented |