Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
276
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0419 # 06 Y:2012 | 06 | 2012 | HEAT WATER WITH EXHAUST HEAT | $5,628 | $35,328 | Not Implemented |
SD0455 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,382 | $200 | Not Implemented |
SD0455 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,441 | $5,300 | Not Implemented |
SD0455 # 03 Y:2012 | 03 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,465 | $2,530 | Not Implemented |
SD0455 # 04 Y:2012 | 04 | 2012 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $706 | $252 | Not Implemented |
SD0455 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $1,808 | $1,295 | Not Implemented |
SD0455 # 06 Y:2012 | 06 | 2012 | INSULATE BARE EQUIPMENT | $5,541 | $4,213 | Not Implemented |
SD0455 # 07 Y:2012 | 07 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,146 | $3,112 | Not Implemented |
SD0455 # 08 Y:2012 | 08 | 2012 | INSULATE FEEDWATER TANK | $2,266 | $2,574 | Not Implemented |
SD0455 # 09 Y:2012 | 09 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,156 | $7,124 | Not Implemented |
SD0455 # 10 Y:2012 | 10 | 2012 | USE PHOTOCELL CONTROLS | $1,606 | $2,550 | Not Implemented |
SF0407 # 01 Y:2012 | 01 | 2012 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $44,715 | $0 | Not Implemented |
SF0407 # 02 Y:2012 | 02 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $7,965 | $672 | Implemented |
SF0407 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,152 | $672 | Implemented |
SF0407 # 04 Y:2012 | 04 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,004 | $0 | Not Implemented |
SF0407 # 05 Y:2012 | 05 | 2012 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $1,231 | $630 | Not Implemented |
SF0407 # 06 Y:2012 | 06 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,437 | $1,299 | Implemented |
SF0407 # 07 Y:2012 | 07 | 2012 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $326 | $312 | Not Implemented |
SF0407 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,040 | $28,647 | Not Implemented |
SF0404 # 01 Y:2011 | 01 | 2011 | OPERATE BOILERS ON HIGH FIRE SETTING | $2,708 | $0 | Not Implemented |
SF0404 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,243 | $0 | Implemented |
SF0404 # 03 Y:2011 | 03 | 2011 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $257 | $22 | Implemented |
SF0404 # 04 Y:2011 | 04 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $17,934 | $5,426 | Implemented |
SF0404 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,812 | $2,778 | Not Implemented |
SF0404 # 06 Y:2011 | 06 | 2011 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $16,688 | $12,500 | Not Implemented |