IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,773

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0061 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $3,751 $3,660 Not Implemented
IA0061 # 06 Y:1993 06 1993 DIRECT WARMEST AIR TO COMBUSTION INTAKE $220 $353 Not Implemented
IA0061 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $110 $120 Implemented
IA0058 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,306 $1,000 Implemented
IA0058 # 02 Y:1993 02 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $416 $1,200 Not Implemented
IA0058 # 03 Y:1993 03 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,091 $4,600 Implemented
IA0058 # 04 Y:1993 04 1993 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $88,602 $95,000 Not Implemented
IA0058 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,994 $250 Implemented
IA0058 # 06 Y:1993 06 1993 INSTALL OCCUPANCY SENSORS $4,847 $1,899 Not Implemented
IA0058 # 07 Y:1993 07 1993 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $7,910 $30,000 Not Implemented
IA0058 # 08 Y:1993 08 1993 DIRECT WARMEST AIR TO COMBUSTION INTAKE $537 $1,100 Not Implemented
ME0109 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $14,260 $2,500 Not Implemented
ME0109 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,215 $4,300 Not Implemented
ME0109 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,548 $4,674 Implemented
ME0109 # 04 Y:1993 04 1993 RECOVER WASTE HEAT FROM EQUIPMENT $5,450 $9,000 Not Implemented
OR0165 # 01 Y:1992 01 1992 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $4,045 $500 Implemented
OR0165 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,788 $0 Implemented
OR0165 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,356 $0 Not Implemented
OR0165 # 04 Y:1992 04 1992 OPTIMIZE PLANT POWER FACTOR $1,074 $2,250 Implemented
OR0165 # 05 Y:1992 05 1992 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $830 $0 Implemented
OR0165 # 06 Y:1992 06 1992 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $320 $824 Implemented
GT0477 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,693 $8,240 Not Implemented
GT0477 # 02 Y:1992 02 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,233 $27,230 Not Implemented
GT0477 # 03 Y:1992 03 1992 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $140 $100 Not Implemented
GT0477 # 04 Y:1992 04 1992 HEAT WATER WITH EXHAUST HEAT $690 $1,490 Not Implemented