IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,731

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0034 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $667 $324 Not Implemented
ND0034 # 07 Y:1992 07 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $58 $231 Not Implemented
OR0156 # 01 Y:1992 01 1992 CHECK FOR ACCURACY OF UTILITY / POWER METERS $23,479 $0 Not Implemented
OR0156 # 02 Y:1992 02 1992 USE MINIMUM STEAM OPERATING PRESSURE $473 $0 Implemented
OR0156 # 03 Y:1992 03 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,966 $1,000 Implemented
OR0156 # 04 Y:1992 04 1992 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $200 $0 Implemented
OR0156 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $387 $360 Not Implemented
OR0156 # 06 Y:1992 06 1992 RECOVER AND REUSE COOLING WATER $3,527 $5,105 Implemented
OR0156 # 07 Y:1992 07 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $102 $164 Implemented
AS0057 # 01 Y:1992 01 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $41,691 $235,000 Not Implemented
AS0057 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,343 $0 Not Implemented
AS0057 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,703 $18,211 Not Implemented
AS0057 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,613 $0 Not Implemented
AS0057 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,028 $300 Not Implemented
AS0057 # 06 Y:1992 06 1992 IMPROVE LUBRICATION PRACTICES $2,000 $3,276 Not Implemented
AS0057 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,215 $3,210 Not Implemented
AS0057 # 08 Y:1992 08 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $989 $200 Not Implemented
AS0057 # 09 Y:1992 09 1992 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,775 $6,535 Not Implemented
AM0152 # 01 Y:1992 01 1992 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $23,665 $13,890 Not Implemented
AM0152 # 02 Y:1992 02 1992 OPERATE BOILERS ON HIGH FIRE SETTING $6,790 $6,500 Not Implemented
AM0152 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,300 $5,610 Not Implemented
AM0152 # 04 Y:1992 04 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,770 $400 Not Implemented
AM0152 # 05 Y:1992 05 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,400 $0 Not Implemented
AM0152 # 06 Y:1992 06 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,010 $1,080 Not Implemented
MA0242 # 01 Y:1992 01 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,258 $18,756 Not Implemented