IAC logo
IAC Assessment: AS0112
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0112
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1994
Principal Product Fluid Milk
NAICS n/a
SIC 2026 - Fluid Milk
Sales $100,000,000-$500,000,000
# of Employees 120
Plant Area (Sq.Ft.) 56,500
Annual Production 12,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $811,934 11,587,632 kWh $0.07
Natural Gas $133,683 31,557 MMBtu $4.24
TOTAL ENERGY COSTS $945,617
RECOMMENDED SAVINGS* $181,882 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,953
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,087
Cost:
$15,256
$11,087 158,265 - - $11,087
158,265
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,310
Cost:
$37,932
$14,310 204,279 - - $14,310
204,279
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,174
Cost:
$9,280
$4,174 59,496 - - $4,174
59,496
kWh
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,508
Cost:
$525
$1,508 21,395 - - $1,508
21,395
kWh
-
-
MMBtu
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,035
Cost:
$400
$1,035 14,654 - - $1,035
14,654
kWh
-
-
MMBtu
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,694
Cost:
$4,000
- - $1,694 400 -
-
kWh
$1,694
400
MMBtu
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,941
Cost:
$16,000
- - $4,941 1,165 -
-
kWh
$4,941
1,165
MMBtu
08: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$2,341
Cost:
$7,000
- - $2,341 552 -
-
kWh
$2,341
552
MMBtu
09: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$305
Cost:
$400
- - $305 72 -
-
kWh
$305
72
MMBtu
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,970
Cost:
$700
$2,970 42,497 - - $2,970
42,497
kWh
-
-
MMBtu
11: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,886
Cost:
-
$1,886 26,964 - - $1,886
26,964
kWh
-
-
MMBtu
12: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$4,287
Cost:
$4,235
$4,287 48,066 - - $4,287
48,066
kWh
-
-
MMBtu
13: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$11,104
Cost:
$16,099
$11,104 158,558 - - $11,104
158,558
kWh
-
-
MMBtu
14: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,107
Cost:
-
$1,107 15,826 - - $1,107
15,826
kWh
-
-
MMBtu
15: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$119,133
Cost:
$463,200
$157,664 3,382,474 $(-38,531) (-17,443) $157,664
3,382,474
kWh
$(-38,531)
(-17,443)
MMBtu
TOTAL RECOMMENDED Savings:
$181,882
Cost:
$575,027
$211,132 4,132,474 $(-29,250) (-15,254) $211,132
4,132,474
kWh
$(-29,250)
(-15,254)
MMBtu
TOTAL IMPLEMENTED Savings:
$45,953
Cost:
$81,787
$41,613 594,079 $4,340 1,024 $41,613
594,079
kWh
$4,340
1,024
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas