Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
98
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0551 # 07 Y:2020 | 07 | 2020 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,687 | $1,936 | Implemented |
UF0551 # 02 Y:2020 | 02 | 2020 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $537,853 | $1,400,000 | Implemented |
UF0551 # 05 Y:2020 | 05 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $14,189 | $1,500 | Implemented |
UF0551 # 03 Y:2020 | 03 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $62,520 | $30,000 | Implemented |
UF0551 # 01 Y:2020 | 01 | 2020 | Install Anaerobic Digester | $1,032,365 | $4,965,000 | Implemented |
UF0551 # 06 Y:2020 | 06 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,254 | $4,938 | Implemented |
UF0551 # 04 Y:2020 | 04 | 2020 | INSTALL TURBULATORS | $18,151 | $7,500 | Not Implemented |
UF0551 # 08 Y:2020 | 08 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,166 | $0 | Implemented |
UF0528 # 03 Y:2019 | 03 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,410 | $1,400 | Not Implemented |
UF0528 # 01 Y:2019 | 01 | 2019 | ISOLATE HOT OR COLD EQUIPMENT | $6,559 | $10,250 | Not Implemented |
UF0528 # 02 Y:2019 | 02 | 2019 | INSTALL TURBULATORS | $5,011 | $7,500 | Implemented |
UF0528 # 07 Y:2019 | 07 | 2019 | INSTALL OCCUPANCY SENSORS | $2,054 | $1,025 | Implemented |
UF0528 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,284 | $3,000 | Implemented |
UF0528 # 08 Y:2019 | 08 | 2019 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $1,676 | $5,000 | Not Implemented |
UF0528 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,248 | $456 | Implemented |
UF0528 # 05 Y:2019 | 05 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,168 | $6,439 | Not Implemented |
UF0443 # 10 Y:2011 | 10 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,822 | $670 | Not Implemented |
UF0443 # 09 Y:2011 | 09 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $80,522 | $8,600 | Not Implemented |
UF0443 # 08 Y:2011 | 08 | 2011 | REPAIR AND ELIMINATE STEAM LEAKS | $156 | $370 | Not Implemented |
UF0443 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,731 | $42,492 | Implemented |
UF0443 # 03 Y:2011 | 03 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,454 | $38,200 | Not Implemented |
UF0443 # 01 Y:2011 | 01 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,607 | $0 | Implemented |
UF0443 # 06 Y:2011 | 06 | 2011 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $19,349 | $2,235 | Implemented |
UF0443 # 07 Y:2011 | 07 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $106,353 | $25,300 | Not Implemented |
UF0443 # 05 Y:2011 | 05 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $562 | $75 | Implemented |