Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
98
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0551 # 07 Y:2020 | 07 | 2020 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,687 | $1,936 | Implemented |
UF0551 # 03 Y:2020 | 03 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $62,520 | $30,000 | Implemented |
UF0551 # 02 Y:2020 | 02 | 2020 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $537,853 | $1,400,000 | Implemented |
UF0551 # 01 Y:2020 | 01 | 2020 | Install Anaerobic Digester | $1,032,365 | $4,965,000 | Implemented |
UF0551 # 04 Y:2020 | 04 | 2020 | INSTALL TURBULATORS | $18,151 | $7,500 | Not Implemented |
UF0551 # 08 Y:2020 | 08 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,166 | $0 | Implemented |
UF0551 # 05 Y:2020 | 05 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $14,189 | $1,500 | Implemented |
UF0551 # 06 Y:2020 | 06 | 2020 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,254 | $4,938 | Implemented |
UF0528 # 08 Y:2019 | 08 | 2019 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $1,676 | $5,000 | Not Implemented |
UF0528 # 07 Y:2019 | 07 | 2019 | INSTALL OCCUPANCY SENSORS | $2,054 | $1,025 | Implemented |
UF0528 # 06 Y:2019 | 06 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,284 | $3,000 | Implemented |
UF0528 # 01 Y:2019 | 01 | 2019 | ISOLATE HOT OR COLD EQUIPMENT | $6,559 | $10,250 | Not Implemented |
UF0528 # 02 Y:2019 | 02 | 2019 | INSTALL TURBULATORS | $5,011 | $7,500 | Implemented |
UF0528 # 03 Y:2019 | 03 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,410 | $1,400 | Not Implemented |
UF0528 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,248 | $456 | Implemented |
UF0528 # 05 Y:2019 | 05 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,168 | $6,439 | Not Implemented |
UF0443 # 08 Y:2011 | 08 | 2011 | REPAIR AND ELIMINATE STEAM LEAKS | $156 | $370 | Not Implemented |
UF0443 # 07 Y:2011 | 07 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $106,353 | $25,300 | Not Implemented |
UF0443 # 06 Y:2011 | 06 | 2011 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $19,349 | $2,235 | Implemented |
UF0443 # 05 Y:2011 | 05 | 2011 | INSTALL TIMERS AND/OR THERMOSTATS | $562 | $75 | Implemented |
UF0443 # 10 Y:2011 | 10 | 2011 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $4,822 | $670 | Not Implemented |
UF0443 # 04 Y:2011 | 04 | 2011 | AIR CONDITION ONLY SPACE NECESSARY | $4,722 | $550 | Not Implemented |
UF0443 # 01 Y:2011 | 01 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,607 | $0 | Implemented |
UF0443 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,731 | $42,492 | Implemented |
UF0443 # 09 Y:2011 | 09 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $80,522 | $8,600 | Not Implemented |