Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 202 | Dairy Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0918 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,414 | $3,500 | Implemented |
GT0918 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,373 | $5,449 | Implemented |
GT0918 # 04 Y:2018 | 04 | 2018 | AVOID FROST FORMATION ON EVAPORATORS | $47,297 | $90,000 | Not Implemented |
GT0918 # 05 Y:2018 | 05 | 2018 | USE OPTIMUM TEMPERATURE | $8,768 | $23,162 | Not Implemented |
GT0918 # 06 Y:2018 | 06 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $232 | $1,000 | Implemented |
GT0918 # 07 Y:2018 | 07 | 2018 | INCREASE AMOUNT OF CONDENSATE RETURNED | $2,630 | $13,862 | Not Implemented |
GT0918 # 01 Y:2018 | 01 | 2018 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,016 | $1,488 | Implemented |
GT0533 # 02 Y:1994 | 02 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,100 | $11,640 | Not Implemented |
GT0533 # 01 Y:1994 | 01 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,740 | $17,700 | Not Implemented |
GT0533 # 03 Y:1994 | 03 | 1994 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,610 | $16,875 | Not Implemented |
GT0533 # 04 Y:1994 | 04 | 1994 | REPAIR AND ELIMINATE STEAM LEAKS | $1,920 | $300 | Not Implemented |
GT0533 # 05 Y:1994 | 05 | 1994 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $510 | $600 | Not Implemented |
GT0533 # 06 Y:1994 | 06 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $680 | $3,750 | Not Implemented |
GT0477 # 08 Y:1992 | 08 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,200 | $6,500 | Not Implemented |
GT0477 # 07 Y:1992 | 07 | 1992 | INSTALL / REPAIR INSULATION ON STEAM LINES | $330 | $690 | Not Implemented |
GT0477 # 01 Y:1992 | 01 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,693 | $8,240 | Not Implemented |
GT0477 # 02 Y:1992 | 02 | 1992 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,233 | $27,230 | Not Implemented |
GT0477 # 03 Y:1992 | 03 | 1992 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $140 | $100 | Not Implemented |
GT0477 # 04 Y:1992 | 04 | 1992 | HEAT WATER WITH EXHAUST HEAT | $690 | $1,490 | Not Implemented |
GT0477 # 05 Y:1992 | 05 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,470 | $450 | Not Implemented |
GT0477 # 06 Y:1992 | 06 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $25,120 | $550 | Not Implemented |
GT0303 # 01 Y:1986 | 01 | 1986 | HEAT WATER WITH EXHAUST HEAT | $1,449 | $8,200 | Not Implemented |
GT0303 # 02 Y:1986 | 02 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,383 | $3,465 | Not Implemented |
GT0303 # 03 Y:1986 | 03 | 1986 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $535 | $722 | Not Implemented |
GT0161 # 04 Y:1983 | 04 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,407 | $17,255 | Not Implemented |