IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0559 # 03 Y:2004 03 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,190 $740 Implemented
CO0559 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $572 $292 Implemented
CO0559 # 08 Y:2004 08 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $650 $4,550 Not Implemented
CO0559 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $1,760 $2,260 Implemented
CO0559 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $355 $416 Implemented
CO0559 # 04 Y:2004 04 2004 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,180 $810 Implemented
CO0559 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $710 $1,790 Implemented
CO0559 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,070 $440 Implemented
LL0207 # 09 Y:2004 09 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $33 $180 Not Implemented
LL0207 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $34,833 $7,488 Implemented
LL0207 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $701 $525 Not Implemented
LL0207 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $99 $120 Not Implemented
LL0207 # 05 Y:2004 05 2004 REPAIR AND ELIMINATE STEAM LEAKS $2,149 $1,960 Implemented
LL0207 # 06 Y:2004 06 2004 USE PHOTOCELL CONTROLS $449 $30 Not Implemented
LL0207 # 03 Y:2004 03 2004 INCREASE AMOUNT OF CONDENSATE RETURNED $6,837 $12,236 Not Implemented
LL0207 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,171 $225 Not Implemented
LL0207 # 01 Y:2004 01 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $36,769 $16,000 Implemented
LL0207 # 11 Y:2004 11 2004 RECOVER AND REUSE COOLING WATER $11,194 $32,000 Not Implemented
LL0207 # 10 Y:2004 10 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $46,500 $3,150 Implemented
SU0197 # 03 Y:2004 03 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,966 $0 Implemented
SU0197 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,106 $0 Not Implemented
SU0197 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,301 $154 Implemented
SU0197 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,462 $725 Implemented
SU0197 # 05 Y:2004 05 2004 INSTALL TURBULATORS $3,875 $350 Not Implemented
SU0197 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,301 $0 Not Implemented