Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
71
matching recommendationsSIC | 2021 | Creamery Butter |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0365 # 12 Y:2019 | 12 | 2019 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $3,967 | $384 | Not Implemented |
MI0365 # 02 Y:2019 | 02 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $22,459 | $2,300 | Not Implemented |
MI0365 # 01 Y:2019 | 01 | 2019 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $434,947 | $1,742,938 | Not Implemented |
MI0365 # 10 Y:2019 | 10 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,083 | $960 | Not Implemented |
MI0365 # 13 Y:2019 | 13 | 2019 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $3,252 | $13,180 | Not Implemented |
MI0365 # 11 Y:2019 | 11 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,193 | $1,980 | Not Implemented |
MI0365 # 03 Y:2019 | 03 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,931 | $12,640 | Not Implemented |
MI0365 # 07 Y:2019 | 07 | 2019 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $10,416 | $10,416 | Not Implemented |
MI0365 # 04 Y:2019 | 04 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,590 | $13,390 | Not Implemented |
MI0365 # 05 Y:2019 | 05 | 2019 | OPTIMIZE PLANT POWER FACTOR | $11,189 | $36,745 | Not Implemented |
MI0365 # 08 Y:2019 | 08 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,108 | $11,078 | Not Implemented |
MI0365 # 06 Y:2019 | 06 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,965 | $6,898 | Not Implemented |
MI0365 # 15 Y:2019 | 15 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $141 | $245 | Not Implemented |
MI0365 # 14 Y:2019 | 14 | 2019 | USE PHOTOCELL CONTROLS | $1,552 | $216 | Not Implemented |
MI0365 # 09 Y:2019 | 09 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,981 | $6,228 | Not Implemented |
UU0139 # 01 Y:2018 | 01 | 2018 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $51,858 | $44,642 | Implemented |
UU0139 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,262 | $20,223 | Implemented |
UU0139 # 03 Y:2018 | 03 | 2018 | USE PHOTOCELL CONTROLS | $4,082 | $2,275 | Implemented |
UU0139 # 04 Y:2018 | 04 | 2018 | INSTALL TIMERS AND/OR THERMOSTATS | $446 | $100 | Implemented |
BD0289 # 01 Y:2005 | 01 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,189 | $3,500 | Implemented |
BD0289 # 02 Y:2005 | 02 | 2005 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,957 | $0 | Implemented |
BD0289 # 07 Y:2005 | 07 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $770 | $1,780 | Implemented |
BD0289 # 08 Y:2005 | 08 | 2005 | USE POWER DURING OFF-PEAK PERIODS | $484 | $0 | Implemented |
BD0289 # 09 Y:2005 | 09 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $315 | $576 | Implemented |
BD0289 # 10 Y:2005 | 10 | 2005 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,052 | $0 | Not Implemented |