IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

71

matching recommendations
Reset
SIC 2021 Creamery Butter
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0365 # 12 Y:2019 12 2019 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $3,967 $384 Not Implemented
MI0365 # 02 Y:2019 02 2019 REPAIR OR REPLACE STEAM TRAPS $22,459 $2,300 Not Implemented
MI0365 # 01 Y:2019 01 2019 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $434,947 $1,742,938 Not Implemented
MI0365 # 10 Y:2019 10 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,083 $960 Not Implemented
MI0365 # 13 Y:2019 13 2019 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,252 $13,180 Not Implemented
MI0365 # 11 Y:2019 11 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,193 $1,980 Not Implemented
MI0365 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,931 $12,640 Not Implemented
MI0365 # 07 Y:2019 07 2019 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $10,416 $10,416 Not Implemented
MI0365 # 04 Y:2019 04 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,590 $13,390 Not Implemented
MI0365 # 05 Y:2019 05 2019 OPTIMIZE PLANT POWER FACTOR $11,189 $36,745 Not Implemented
MI0365 # 08 Y:2019 08 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,108 $11,078 Not Implemented
MI0365 # 06 Y:2019 06 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,965 $6,898 Not Implemented
MI0365 # 15 Y:2019 15 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $141 $245 Not Implemented
MI0365 # 14 Y:2019 14 2019 USE PHOTOCELL CONTROLS $1,552 $216 Not Implemented
MI0365 # 09 Y:2019 09 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,981 $6,228 Not Implemented
UU0139 # 01 Y:2018 01 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $51,858 $44,642 Implemented
UU0139 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,262 $20,223 Implemented
UU0139 # 03 Y:2018 03 2018 USE PHOTOCELL CONTROLS $4,082 $2,275 Implemented
UU0139 # 04 Y:2018 04 2018 INSTALL TIMERS AND/OR THERMOSTATS $446 $100 Implemented
BD0289 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $6,189 $3,500 Implemented
BD0289 # 02 Y:2005 02 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,957 $0 Implemented
BD0289 # 07 Y:2005 07 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $770 $1,780 Implemented
BD0289 # 08 Y:2005 08 2005 USE POWER DURING OFF-PEAK PERIODS $484 $0 Implemented
BD0289 # 09 Y:2005 09 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $315 $576 Implemented
BD0289 # 10 Y:2005 10 2005 PAY BILLS ON TIME TO AVOID LATE FEES $1,052 $0 Not Implemented