Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
511
matching recommendationsSIC | 2022 | Cheese, Natural And Processed |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0163 # 01 Y:2021 | 01 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,131 | $40,000 | Not Implemented |
BS0132 # 01 Y:2019 | 01 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $21,247 | $10,080 | Not Implemented |
BS0132 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,999 | $680 | Not Implemented |
BS0132 # 03 Y:2019 | 03 | 2019 | OPERATE BOILERS ON HIGH FIRE SETTING | $51,880 | $0 | Not Implemented |
BS0132 # 04 Y:2019 | 04 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $11,835 | $21,198 | Not Implemented |
BS0132 # 05 Y:2019 | 05 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,164 | $15,537 | Not Implemented |
BS0132 # 06 Y:2019 | 06 | 2019 | INSTALL OCCUPANCY SENSORS | $5,715 | $8,435 | Not Implemented |
BS0132 # 07 Y:2019 | 07 | 2019 | REPAIR OR REPLACE STEAM TRAPS | $6,466 | $6,828 | Not Implemented |
BS0132 # 08 Y:2019 | 08 | 2019 | AVOID FROST FORMATION ON EVAPORATORS | $3,938 | $2,781 | Not Implemented |
BS0132 # 09 Y:2019 | 09 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $10,840 | $16,194 | Not Implemented |
BS0132 # 10 Y:2019 | 10 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $682 | $1,005 | Not Implemented |
BS0132 # 11 Y:2019 | 11 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $14,577 | $12,760 | Not Implemented |
IP0125 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,774 | $150 | Not Implemented |
IP0125 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,180 | $354 | Implemented |
IP0125 # 03 Y:2019 | 03 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $932 | $315 | Implemented |
IP0125 # 04 Y:2019 | 04 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $908 | $1,344 | Implemented |
IP0125 # 05 Y:2019 | 05 | 2019 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $269 | $500 | Implemented |
IP0125 # 06 Y:2019 | 06 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,324 | $8,560 | Implemented |
IP0125 # 07 Y:2019 | 07 | 2019 | REDUCE EXCESSIVE BOILER BLOWDOWN | $2,364 | $6,720 | Implemented |
IP0125 # 08 Y:2019 | 08 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $133 | $390 | Implemented |
UD0995 # 09 Y:2019 | 09 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,887 | $17,856 | Implemented |
UD0995 # 08 Y:2019 | 08 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $606 | $0 | Implemented |
UD0995 # 07 Y:2019 | 07 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,847 | $11,694 | Implemented |
UD0995 # 06 Y:2019 | 06 | 2019 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $35,713 | $75,000 | Not Implemented |
UD0995 # 05 Y:2019 | 05 | 2019 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $110,256 | $150,000 | Not Implemented |