IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

278

matching recommendations
Reset
SIC 2023 Dry, Condensed, Evaporated Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0190 # 03 Y:1996 03 1996 INSTALL OCCUPANCY SENSORS $2,310 $2,025 Implemented
AS0190 # 04 Y:1996 04 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,913 $5,700 Implemented
AS0190 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,052 $2,348 Not Implemented
AS0190 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $190,648 $100,000 Implemented
AS0190 # 07 Y:1996 07 1996 USE SYNTHETIC LUBRICANT $3,954 $1,150 Not Implemented
AS0190 # 08 Y:1996 08 1996 MINIMIZE WATER USAGE $10,501 $200 Implemented
SF0067 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,292 $6,960 Implemented
SF0067 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $375 $795 Implemented
SF0067 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $3,408 $1,478 Implemented
SF0067 # 04 Y:1995 04 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,075 $0 Implemented
SF0067 # 05 Y:1995 05 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $758 $450 Implemented
SF0067 # 06 Y:1995 06 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,872 $6,773 Not Implemented
SF0067 # 07 Y:1995 07 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $696 $850 Implemented
SF0067 # 08 Y:1995 08 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,803 $0 Implemented
WI0232 # 01 Y:1995 01 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,507 $500 Not Implemented
WI0232 # 02 Y:1995 02 1995 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,343 $10,000 Not Implemented
WI0232 # 03 Y:1995 03 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,427 $20 Not Implemented
WI0232 # 04 Y:1995 04 1995 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,004 $0 Not Implemented
WI0232 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,246 $1,805 Not Implemented
WI0232 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $188 $0 Not Implemented
WI0232 # 07 Y:1995 07 1995 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $401 $260 Not Implemented
WI0232 # 08 Y:1995 08 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $244 $640 Not Implemented
WI0232 # 09 Y:1995 09 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $139 $0 Not Implemented
MS0006 # 01 Y:1994 01 1994 INCREASE AMOUNT OF CONDENSATE RETURNED $3,908 $8,000 Not Implemented
MS0006 # 02 Y:1994 02 1994 OPTIMIZE PLANT POWER FACTOR $3,266 $3,060 Not Implemented