IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 2023 Dry, Condensed, Evaporated Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0592 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,440 $12,400 Implemented
SD0592 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,470 $13,092 Implemented
SD0592 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $2,444 $900 Not Implemented
SD0592 # 05 Y:2020 05 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,751 $5,661 Implemented
SD0592 # 01 Y:2020 01 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $61,433 $149,300 Implemented
SF0492 # 11 Y:2016 11 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $12,365 $30,659 Implemented
SF0492 # 08 Y:2016 08 2016 INSULATE BARE EQUIPMENT $7,565 $13,378 Implemented
SF0492 # 09 Y:2016 09 2016 INSULATE BARE EQUIPMENT $165 $292 Implemented
SF0492 # 06 Y:2016 06 2016 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $8,794 $15,281 Implemented
SF0492 # 07 Y:2016 07 2016 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,867 $11,727 Implemented
SF0492 # 10 Y:2016 10 2016 INSTALL OCCUPANCY SENSORS $8,681 $17,643 Implemented
SF0492 # 12 Y:2016 12 2016 RECOVER WASTE HEAT FROM EQUIPMENT $17,145 $45,338 Not Implemented
SF0492 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,076 $5,200 Implemented
SF0492 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,543 $7,437 Implemented
SF0492 # 01 Y:2016 01 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $13,265 $280 Implemented
SF0492 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $218 $33 Implemented
SF0492 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,830 $14,614 Implemented
SF0310 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,603 $14,240 Not Implemented
SF0310 # 10 Y:2005 10 2005 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $38,197 $66,900 Not Implemented
SF0310 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,347 $480 Not Implemented
SF0310 # 02 Y:2005 02 2005 REPAIR AND ELIMINATE STEAM LEAKS $728 $120 Not Implemented
SF0310 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,633 $3,457 Not Implemented
SF0310 # 04 Y:2005 04 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,150 $2,900 Not Implemented
SF0310 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $1,456 $1,635 Not Implemented
SF0310 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,570 $1,687 Not Implemented