Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsSIC | 2023 | Dry, Condensed, Evaporated Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0734 # 01 Y:2016 | 01 | 2016 | REDESIGN PROCESS | $69,240 | $103,200 | n/a |
CO0734 # 02 Y:2016 | 02 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,460 | $2,220 | n/a |
CO0734 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,110 | $570 | n/a |
CO0734 # 04 Y:2016 | 04 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,560 | $3,590 | n/a |
CO0734 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,330 | $46,120 | n/a |
SF0492 # 12 Y:2016 | 12 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,145 | $45,338 | Not Implemented |
SF0492 # 11 Y:2016 | 11 | 2016 | INCREASE AMOUNT OF CONDENSATE RETURNED | $12,365 | $30,659 | Implemented |
SF0492 # 10 Y:2016 | 10 | 2016 | INSTALL OCCUPANCY SENSORS | $8,681 | $17,643 | Implemented |
SF0492 # 09 Y:2016 | 09 | 2016 | INSULATE BARE EQUIPMENT | $165 | $292 | Implemented |
SF0492 # 08 Y:2016 | 08 | 2016 | INSULATE BARE EQUIPMENT | $7,565 | $13,378 | Implemented |
SF0492 # 07 Y:2016 | 07 | 2016 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,867 | $11,727 | Implemented |
SF0492 # 06 Y:2016 | 06 | 2016 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $8,794 | $15,281 | Implemented |
SF0492 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,830 | $14,614 | Implemented |
SF0492 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,543 | $7,437 | Implemented |
SF0492 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,076 | $5,200 | Implemented |
SF0492 # 02 Y:2016 | 02 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $218 | $33 | Implemented |
SF0492 # 01 Y:2016 | 01 | 2016 | INCREASE AMOUNT OF CONDENSATE RETURNED | $13,265 | $280 | Implemented |
BS0070 # 08 Y:2016 | 08 | 2016 | REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING | $9,918 | $88,300 | Not Implemented |
BS0070 # 07 Y:2016 | 07 | 2016 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $161 | $43 | Implemented |
BS0070 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $220 | $585 | Implemented |
BS0070 # 05 Y:2016 | 05 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $418 | $14 | Implemented |
BS0070 # 04 Y:2016 | 04 | 2016 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $1,079 | $4,500 | Implemented |
BS0070 # 03 Y:2016 | 03 | 2016 | PAY UTILITY BILLS ON TIME | $2,153 | $213 | Implemented |
BS0070 # 02 Y:2016 | 02 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,026 | $744 | Implemented |
BS0070 # 01 Y:2016 | 01 | 2016 | REPAIR OR REPLACE STEAM TRAPS | $13,590 | $12,584 | Implemented |