Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2016 |
Principal Product | Non-Fat Dried Milk Powder |
NAICS | 311514 - Dry, Condensed, and Evaporated Dairy Product Manufacturing |
SIC | 2023 - Dry, Condensed, Evaporated Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 46 |
Plant Area (Sq.Ft.) | 67,900 |
Annual Production | 23,100,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $651,381 | 8,870,400 | kWh | $0.07 |
Electricity Demand | $217,231 | 21,264 | kW-months/year | $10.22 |
Electricity Fees | $42 | - | $ | - |
Natural Gas | $626,939 | 106,321 | MMBtu | $5.90 |
TOTAL ENERGY COSTS | $1,495,593 | |||
RECOMMENDED SAVINGS* | $115,700 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.5194 REDESIGN PROCESS |
Savings: $69,240 Cost: $103,200 |
$29,740 | 424,800 | $8,680 | 850 | $30,820 | 5,144 | - | - | - | - |
$29,740 424,800 kWh |
$8,680 850 kW-months/year |
$30,820 5,144 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $5,460 Cost: $2,220 |
$4,370 | 62,400 | $1,090 | 107 | - | - | - | - | - | - |
$4,370 62,400 kWh |
$1,090 107 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,110 Cost: $570 |
$4,260 | 60,800 | $850 | 83 | - | - | - | - | - | - |
$4,260 60,800 kWh |
$850 83 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $4,560 Cost: $3,590 |
- | - | - | - | $4,560 | 762 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,560 762 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $31,330 Cost: $46,120 |
$27,080 | 386,800 | $5,620 | 550 | - | - | $670 | - | $(-2,040) | - |
$27,080 386,800 kWh |
$5,620 550 kW-months/year |
- - MMBtu |
$670 - $ |
$(-2,040) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $115,700 Cost: $155,700 |
$65,450 | 934,800 | $16,240 | 1,590 | $35,380 | 5,906 | $670 | - | $(-2,040) | - | $65,450 934,800 kWh |
$16,240 1,590 kW-months/year |
$35,380 5,906 MMBtu |
$670 - $ |
$(-2,040) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |