IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

506

matching recommendations
Reset
SIC 2024 Ice Cream And Frozen Desserts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0230 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $190 $66 Implemented
IA0061 # 01 Y:1993 01 1993 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $136,096 $379,828 Not Implemented
IA0061 # 02 Y:1993 02 1993 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $68,521 $75,677 Not Implemented
IA0061 # 03 Y:1993 03 1993 REPLACE BOILER $15,800 $23,150 Not Implemented
IA0061 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,928 $1,939 Implemented
IA0061 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $3,751 $3,660 Not Implemented
IA0061 # 06 Y:1993 06 1993 DIRECT WARMEST AIR TO COMBUSTION INTAKE $220 $353 Not Implemented
IA0061 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $110 $120 Implemented
AS0057 # 01 Y:1992 01 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $41,691 $235,000 Not Implemented
AS0057 # 02 Y:1992 02 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,343 $0 Not Implemented
AS0057 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,703 $18,211 Not Implemented
AS0057 # 04 Y:1992 04 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,613 $0 Not Implemented
AS0057 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,028 $300 Not Implemented
AS0057 # 06 Y:1992 06 1992 IMPROVE LUBRICATION PRACTICES $2,000 $3,276 Not Implemented
AS0057 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,215 $3,210 Not Implemented
AS0057 # 08 Y:1992 08 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $989 $200 Not Implemented
AS0057 # 09 Y:1992 09 1992 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,775 $6,535 Not Implemented
WI0138 # 01 Y:1992 01 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $19,710 $12,800 Implemented
WI0138 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,678 $2 Implemented
WI0138 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $1,429 $200 Implemented
WI0138 # 04 Y:1992 04 1992 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,643 $5,000 Not Implemented
WI0138 # 05 Y:1992 05 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,342 $500 Implemented
WI0138 # 06 Y:1992 06 1992 REPAIR AND ELIMINATE STEAM LEAKS $247 $200 Implemented
WI0138 # 07 Y:1992 07 1992 INSULATE BARE EQUIPMENT $331 $168 Implemented
OR0122 # 05 Y:1991 05 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $378 $400 Implemented