IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 2024 Ice Cream And Frozen Desserts
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CI0032 # 02 Y:2024 02 2024 INSULATE BARE EQUIPMENT $10,726 $2,419 n/a
CI0032 # 03 Y:2024 03 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,326 $24,000 n/a
CI0032 # 04 Y:2024 04 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,168 $13,563 n/a
CI0032 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,401 $0 n/a
CI0032 # 06 Y:2024 06 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,536 $22,885 n/a
CI0032 # 07 Y:2024 07 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,346 $100 n/a
CI0032 # 08 Y:2024 08 2024 INSTALL OCCUPANCY SENSORS $1,100 $2,025 n/a
CI0032 # 09 Y:2024 09 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $454 $1,050 n/a
CI0032 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $47,412 $313,000 n/a
SD0601 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $130 $360 Not Implemented
SD0601 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $139 $225 Implemented
SD0601 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $295 $504 Implemented
SD0601 # 01 Y:2020 01 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $714 $1,555 Implemented
SD0271 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,502 $3,200 Not Implemented
SD0271 # 06 Y:2001 06 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,000 $1,340 Not Implemented
SD0271 # 07 Y:2001 07 2001 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $256,765 $1,482,000 Not Implemented
SD0271 # 08 Y:2001 08 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $79,200 $300 Implemented
SD0271 # 09 Y:2001 09 2001 INSTALL AUTOMATIC PACKING EQUIPMENT $154,900 $125,000 Not Implemented
SD0271 # 10 Y:2001 10 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $79,200 $6,600 Not Implemented
SD0271 # 11 Y:2001 11 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $76,200 $35,000 Not Implemented
SD0271 # 12 Y:2001 12 2001 PAY BILLS ON TIME TO AVOID LATE FEES $925 $0 Not Implemented
SD0271 # 04 Y:2001 04 2001 INSTALL SKYLIGHTS $3,038 $8,000 Not Implemented
SD0271 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,818 $18,000 Not Implemented
SD0271 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,184 $360 Implemented
SD0271 # 01 Y:2001 01 2001 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,508 $0 Not Implemented