Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Diego State University |
---|---|
Assessment Year | 2001 |
Principal Product | Ice cream |
NAICS | n/a |
SIC | 2024 - Ice Cream And Frozen Desserts |
Sales | $10,000,000-$50,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 12,000 Thousand Gallons |
Production Hrs. Annual | 6,600 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,411,825 | 18,377,000 | kWh | $0.08 |
Electricity Demand | $423,245 | 43,873 | kW-months/year | $9.65 |
Electricity Fees | $9,156 | - | $ | - |
Natural Gas | $169,449 | 27,251 | MMBtu | $6.22 |
TOTAL ENERGY COSTS | $2,013,675 | |||
RECOMMENDED SAVINGS* | $678,240 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $85,384 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $6,508 Cost: - |
- | - | $6,508 | 444 | - | - | - | - | - | - | - | - |
- - kWh |
$6,508 444 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,184 Cost: $360 |
$4,863 | 91,239 | $1,321 | 130 | - | - | - | - | - | - | - | - |
$4,863 91,239 kWh |
$1,321 130 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $12,818 Cost: $18,000 |
$9,526 | 178,727 | $3,292 | 325 | - | - | - | - | - | - | - | - |
$9,526 178,727 kWh |
$3,292 325 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7145 INSTALL SKYLIGHTS |
Savings: $3,038 Cost: $8,000 |
$1,275 | 23,925 | $1,763 | 174 | - | - | - | - | - | - | - | - |
$1,275 23,925 kWh |
$1,763 174 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $1,502 Cost: $3,200 |
$1,281 | 24,033 | $221 | 22 | - | - | - | - | - | - | - | - |
$1,281 24,033 kWh |
$221 22 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $1,000 Cost: $1,340 |
$835 | 15,664 | $165 | 16 | - | - | - | - | - | - | - | - |
$835 15,664 kWh |
$165 16 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST |
Savings: $256,765 Cost: $1,482,000 |
$425,654 | 7,986,000 | $147,088 | 14,520 | $(-671,805) | (-108,042) | - | - | - | - | $355,828 | - |
$425,654 7,986,000 kWh |
$147,088 14,520 kW-months/year |
$(-671,805) (-108,042) MMBtu |
- - $ |
- - $ |
$355,828 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $79,200 Cost: $300 |
- | - | - | - | - | - | $79,200 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$79,200 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $154,900 Cost: $125,000 |
- | - | - | - | - | - | $158,400 | - | $(-3,500) | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$158,400 - $ |
$(-3,500) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $79,200 Cost: $6,600 |
- | - | - | - | - | - | $79,200 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$79,200 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $76,200 Cost: $35,000 |
- | - | - | - | - | - | $79,200 | - | $(-3,000) | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$79,200 - $ |
$(-3,000) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $925 Cost: - |
- | - | - | - | - | - | - | - | $925 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$925 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $678,240 Cost: $1,679,800 |
$443,434 | 8,319,588 | $160,358 | 15,631 | $(-671,805) | (-108,042) | $396,000 | - | $(-5,575) | - | $355,828 | - | $443,434 8,319,588 kWh |
$160,358 15,631 kW-months/year |
$(-671,805) (-108,042) MMBtu |
$396,000 - $ |
$(-5,575) - $ |
$355,828 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $85,384 Cost: $660 |
$4,863 | 91,239 | $1,321 | 130 | - | - | $79,200 | - | - | - | - | - | $4,863 91,239 kWh |
$1,321 130 kW-months/year |
- - MMBtu |
$79,200 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | One-time Revenue or Avoided Cost |