Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsSIC | 2024 | Ice Cream And Frozen Desserts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0095 # 05 Y:2005 | 05 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,720 | $450 | Not Implemented |
UU0095 # 04 Y:2005 | 04 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $710 | $305 | Not Implemented |
UU0095 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $54,985 | $40,000 | Not Implemented |
UU0095 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,800 | $20,000 | Not Implemented |
UU0095 # 01 Y:2005 | 01 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,360 | $2,000 | Implemented |
UU0094 # 05 Y:2005 | 05 | 2005 | USE OPTIMUM THICKNESS INSULATION | $110 | $150 | Not Implemented |
UU0094 # 04 Y:2005 | 04 | 2005 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,540 | $0 | Not Implemented |
UU0094 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $370 | $220 | Not Implemented |
UU0094 # 02 Y:2005 | 02 | 2005 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,260 | $7,000 | Not Implemented |
UU0094 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,140 | $380 | Not Implemented |
OK0704 # 09 Y:2005 | 09 | 2005 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,463 | $13,554 | Not Implemented |
OK0704 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $165 | $1,153 | Not Implemented |
OK0704 # 08 Y:2005 | 08 | 2005 | INSTALL SET-BACK TIMERS | $1,663 | $20 | Not Implemented |
OK0704 # 06 Y:2005 | 06 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,769 | $11,310 | Not Implemented |
OK0704 # 01 Y:2005 | 01 | 2005 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $7,257 | $5,175 | Not Implemented |
OK0704 # 02 Y:2005 | 02 | 2005 | OPERATE BOILERS ON HIGH FIRE SETTING | $4,358 | $1,436 | Not Implemented |
OK0704 # 03 Y:2005 | 03 | 2005 | INSTALL OCCUPANCY SENSORS | $820 | $688 | Not Implemented |
OK0704 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,912 | $8,734 | Not Implemented |
OK0704 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,011 | $2,257 | Not Implemented |
OK0704 # 07 Y:2005 | 07 | 2005 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $8,000 | $0 | Not Implemented |
MI0101 # 01 Y:2005 | 01 | 2005 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $51,010 | $72,500 | Not Implemented |
MI0101 # 07 Y:2005 | 07 | 2005 | INSULATE BARE EQUIPMENT | $294 | $195 | Not Implemented |
MI0101 # 06 Y:2005 | 06 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,386 | $1,030 | Implemented |
MI0101 # 05 Y:2005 | 05 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,200 | $6,660 | Implemented |
MI0101 # 04 Y:2005 | 04 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $4,336 | $600 | Not Implemented |