Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsSIC | 2024 | Ice Cream And Frozen Desserts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0603 # 02 Y:2006 | 02 | 2006 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $54,146 | $2,000 | Implemented |
MA0603 # 17 Y:2006 | 17 | 2006 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $172 | $0 | Implemented |
MA0603 # 16 Y:2006 | 16 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $650 | $4,000 | Implemented |
MA0603 # 15 Y:2006 | 15 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $874 | $4,000 | Implemented |
MA0603 # 14 Y:2006 | 14 | 2006 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $1,402 | $0 | Implemented |
MA0603 # 13 Y:2006 | 13 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $2,847 | $1,600 | Not Implemented |
MA0603 # 12 Y:2006 | 12 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,508 | $10,500 | Not Implemented |
MA0603 # 11 Y:2006 | 11 | 2006 | BURN WASTE OIL FOR HEAT | $3,685 | $6,500 | Implemented |
MA0603 # 10 Y:2006 | 10 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,287 | $0 | Implemented |
MA0603 # 08 Y:2006 | 08 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $16,480 | $50,000 | Implemented |
MA0603 # 07 Y:2006 | 07 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $16,595 | $83,500 | Implemented |
MA0603 # 06 Y:2006 | 06 | 2006 | USE UTILITY CONTROLLED POWER MANAGEMENT | $24,068 | $0 | Not Implemented |
MA0603 # 05 Y:2006 | 05 | 2006 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $26,243 | $30,600 | Not Implemented |
MA0603 # 04 Y:2006 | 04 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $34,778 | $8,125 | Implemented |
MA0603 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,920 | $83,405 | Implemented |
MA0603 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $715,984 | $3,400,000 | Not Implemented |
MA0603 # 09 Y:2006 | 09 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,490 | $6,000 | Not Implemented |
SU0224 # 13 Y:2006 | 13 | 2006 | REDUCE VENTILATION AIR | $2,430 | $15,374 | Implemented |
SU0224 # 12 Y:2006 | 12 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,037 | $11,000 | Implemented |
SU0224 # 11 Y:2006 | 11 | 2006 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $77 | $348 | Implemented |
SU0224 # 10 Y:2006 | 10 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,736 | $14,580 | Implemented |
SU0224 # 09 Y:2006 | 09 | 2006 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $43,464 | $52,154 | Implemented |
SU0224 # 08 Y:2006 | 08 | 2006 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $79,657 | $50,307 | Implemented |
SU0224 # 07 Y:2006 | 07 | 2006 | KEEP BOILER TUBES CLEAN | $2,726 | $1,466 | Implemented |
SU0224 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,340 | $825 | Implemented |