Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2006 |
Principal Product | Ice cream and frozen treats |
NAICS | 311813 - Frozen Cakes, Pies, and Other Pastries Manufacturing |
SIC | 2024 - Ice Cream And Frozen Desserts |
Sales | $50,000,000-$100,000,000 |
# of Employees | 1,200 |
Plant Area (Sq.Ft.) | 300,000 |
Annual Production | 15,288 Thousand Gallons |
Production Hrs. Annual | 7,176 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,250,286 | 19,435,192 | kWh | $0.06 |
Electricity Demand | $280,492 | 36,552 | kW-months/year | $7.67 |
Natural Gas | $271,758 | 26,490 | MMBtu | $10.26 |
Fuel Oil #2 | $49,603 | 4,299 | MMBtu | $11.54 |
TOTAL ENERGY COSTS | $2,017,014 | |||
RECOMMENDED SAVINGS* | $956,129 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $174,989 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Other Liquid (non-haz) | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Other Liquid (non-haz) | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | gal | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR |
Savings: $715,984 Cost: $3,400,000 |
$644,736 | 10,074,000 | $108,192 | 13,800 | $273,336 | 16,800 | - | - | - | - | $(-310,280) | - |
$644,736 10,074,000 kWh |
$108,192 13,800 kW-months/year |
$273,336 16,800 MMBtu |
- - MMBtu |
- - gal |
$(-310,280) - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS |
Savings: $54,146 Cost: $2,000 |
- | - | - | - | $54,146 | 3,328 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$54,146 3,328 MMBtu |
- - MMBtu |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $41,920 Cost: $83,405 |
$36,755 | 574,340 | $5,165 | 660 | - | - | - | - | - | - | - | - |
$36,755 574,340 kWh |
$5,165 660 kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $34,778 Cost: $8,125 |
$338 | 5,275 | - | - | - | - | $34,440 | 2,230 | - | - | - | - |
$338 5,275 kWh |
- - kW-months/year |
- - MMBtu |
$34,440 2,230 MMBtu |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS |
Savings: $26,243 Cost: $30,600 |
- | - | - | - | $26,243 | 1,613 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$26,243 1,613 MMBtu |
- - MMBtu |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.8122 USE UTILITY CONTROLLED POWER MANAGEMENT |
Savings: $24,068 Cost: - |
$1,024 | (-400) | $23,044 | 178 | - | - | - | - | - | - | - | - |
$1,024 (-400) kWh |
$23,044 178 kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $16,595 Cost: $83,500 |
$16,595 | 259,300 | - | - | - | - | - | - | - | - | - | - |
$16,595 259,300 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $16,480 Cost: $50,000 |
$14,110 | 220,460 | $2,370 | 302 | - | - | - | - | - | - | - | - |
$14,110 220,460 kWh |
$2,370 302 kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $8,490 Cost: $6,000 |
- | - | - | - | $8,490 | 522 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$8,490 522 MMBtu |
- - MMBtu |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $4,287 Cost: - |
$2,438 | 38,100 | $1,849 | 236 | - | - | - | - | - | - | - | - |
$2,438 38,100 kWh |
$1,849 236 kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.6124 BURN WASTE OIL FOR HEAT |
Savings: $3,685 Cost: $6,500 |
- | - | - | - | - | - | $3,685 | 239 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,685 239 MMBtu |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,508 Cost: $10,500 |
$538 | 8,400 | - | - | - | - | - | - | $2,970 | 761,652 | - | - |
$538 8,400 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
$2,970 761,652 gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $2,847 Cost: $1,600 |
- | - | - | - | $2,847 | 175 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,847 175 MMBtu |
- - MMBtu |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $1,402 Cost: - |
$1,402 | 21,900 | - | - | - | - | - | - | - | - | - | - |
$1,402 21,900 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $874 Cost: $4,000 |
$749 | 11,700 | $125 | 16 | - | - | - | - | - | - | - | - |
$749 11,700 kWh |
$125 16 kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $650 Cost: $4,000 |
$556 | 8,700 | $94 | 12 | - | - | - | - | - | - | - | - |
$556 8,700 kWh |
$94 12 kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $172 Cost: - |
$172 | 2,700 | - | - | - | - | - | - | - | - | - | - |
$172 2,700 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $956,129 Cost: $3,690,230 |
$719,413 | 11,224,475 | $140,839 | 15,204 | $365,062 | 22,438 | $38,125 | 2,469 | $2,970 | 761,652 | $(-310,280) | - | $719,413 11,224,475 kWh |
$140,839 15,204 kW-months/year |
$365,062 22,438 MMBtu |
$38,125 2,469 MMBtu |
$2,970 761,652 gal |
$(-310,280) - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $174,989 Cost: $241,530 |
$73,115 | 1,142,475 | $9,603 | 1,226 | $54,146 | 3,328 | $38,125 | 2,469 | - | - | - | - | $73,115 1,142,475 kWh |
$9,603 1,226 kW-months/year |
$54,146 3,328 MMBtu |
$38,125 2,469 MMBtu |
- - gal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | gal | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Other Liquid (non-haz) | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Other Liquid (non-haz) | Water Consumption |