Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
366
matching recommendationsSIC | 2024 | Ice Cream And Frozen Desserts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0290 # 08 Y:2009 | 08 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,204 | $2,500 | Implemented |
LE0290 # 10 Y:2009 | 10 | 2009 | INSTALL OCCUPANCY SENSORS | $1,045 | $0 | Implemented |
LE0290 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,543 | $750 | Implemented |
LE0290 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,148 | $152 | Not Implemented |
LE0290 # 12 Y:2009 | 12 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $990 | $2,500 | Implemented |
LE0290 # 11 Y:2009 | 11 | 2009 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $900 | $1,500 | Not Implemented |
LE0290 # 06 Y:2009 | 06 | 2009 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,400 | $500 | Not Implemented |
LE0290 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,837 | $15,700 | Not Implemented |
LE0290 # 01 Y:2009 | 01 | 2009 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,385 | $1,200 | Not Implemented |
LE0290 # 03 Y:2009 | 03 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,929 | $2,000 | Not Implemented |
LE0290 # 09 Y:2009 | 09 | 2009 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,150 | $2,500 | Implemented |
LE0290 # 07 Y:2009 | 07 | 2009 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,267 | $0 | Implemented |
MA0603 # 09 Y:2006 | 09 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,490 | $6,000 | Not Implemented |
MA0603 # 10 Y:2006 | 10 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,287 | $0 | Implemented |
MA0603 # 07 Y:2006 | 07 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $16,595 | $83,500 | Implemented |
MA0603 # 06 Y:2006 | 06 | 2006 | USE UTILITY CONTROLLED POWER MANAGEMENT | $24,068 | $0 | Not Implemented |
MA0603 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,920 | $83,405 | Implemented |
MA0603 # 11 Y:2006 | 11 | 2006 | BURN WASTE OIL FOR HEAT | $3,685 | $6,500 | Implemented |
MA0603 # 08 Y:2006 | 08 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $16,480 | $50,000 | Implemented |
MA0603 # 12 Y:2006 | 12 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,508 | $10,500 | Not Implemented |
MA0603 # 13 Y:2006 | 13 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $2,847 | $1,600 | Not Implemented |
MA0603 # 02 Y:2006 | 02 | 2006 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $54,146 | $2,000 | Implemented |
MA0603 # 05 Y:2006 | 05 | 2006 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $26,243 | $30,600 | Not Implemented |
MA0603 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $715,984 | $3,400,000 | Not Implemented |
MA0603 # 04 Y:2006 | 04 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $34,778 | $8,125 | Implemented |