IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

644

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0011 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $478 $120 Implemented
NV0011 # 06 Y:1994 06 1994 RECOVER WASTE HEAT FROM EQUIPMENT $11,100 $1,400 Implemented
NV0011 # 08 Y:1994 08 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,913 $292 Implemented
KG0007 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,755 $15,840 Implemented
KG0007 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,968 $618 Implemented
OR0211 # 01 Y:1994 01 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $872 $643 Implemented
OR0211 # 02 Y:1994 02 1994 USE PHOTOCELL CONTROLS $152 $50 Implemented
OR0211 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $711 $364 Implemented
OR0211 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $236 $427 Implemented
OR0211 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $308 $978 Implemented
OR0211 # 06 Y:1994 06 1994 OPTIMIZE PLANT POWER FACTOR $2,527 $2,400 Implemented
OR0211 # 07 Y:1994 07 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $14,967 $12,300 Implemented
OR0211 # 08 Y:1994 08 1994 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $196 $900 Implemented
OR0211 # 09 Y:1994 09 1994 REDUCE FLUID FLOW RATES $6,185 $7,611 Implemented
UD0434 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $4,831 $8,000 Implemented
UD0434 # 02 Y:1994 02 1994 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $14,462 $7,500 Implemented
UD0434 # 03 Y:1994 03 1994 USE POWER DURING OFF-PEAK PERIODS $13,081 $0 Implemented
UD0434 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,504 $12,960 Implemented
UD0434 # 05 Y:1994 05 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,045 $300 Implemented
MO0121 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,377 $13,819 Implemented
MO0121 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,359 $550 Implemented
MO0121 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,040 $6,204 Implemented
AM0212 # 03 Y:1994 03 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $140 $0 Implemented
OR0204 # 01 Y:1994 01 1994 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $11,122 $5,000 Implemented
OR0204 # 02 Y:1994 02 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $912 $3,000 Implemented