Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, Kingsville
Assessment Year 1995
Principal Product Milk,fruit,cream,cottage cheese,and ice cream mixes
NAICS n/a
SIC 2026 - Fluid Milk
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 34,521
Annual Production 28,800 Thousand Gallons
Production Hrs. Annual 8,112
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $388,119 8,849,942 kWh $0.04
Natural Gas $81,231 30,903 MMBtu $2.63
TOTAL ENERGY COSTS $469,350
RECOMMENDED SAVINGS* $34,685 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,724
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,705
Cost:
$19,230
$9,705 260,551 - - $9,705
260,551
kWh
-
-
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,534
Cost:
$2,850
- - $8,534 3,245 -
-
kWh
$8,534
3,245
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$7,624
Cost:
$2,518
- - $7,624 1,802 -
-
kWh
$7,624
1,802
MMBtu
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$3,434
Cost:
$5,070
$3,434 75,029 - - $3,434
75,029
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,427
Cost:
$780
$2,427 55,686 - - $2,427
55,686
kWh
-
-
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,297
Cost:
$750
$2,297 75,029 - - $2,297
75,029
kWh
-
-
MMBtu
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$664
Cost:
$1,500
- - $664 252 -
-
kWh
$664
252
MMBtu
TOTAL RECOMMENDED Savings:
$34,685
Cost:
$32,698
$17,863 466,295 $16,822 5,299 $17,863
466,295
kWh
$16,822
5,299
MMBtu
TOTAL IMPLEMENTED Savings:
$31,724
Cost:
$30,448
$15,566 391,266 $16,158 5,047 $15,566
391,266
kWh
$16,158
5,047
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas