Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK2001 # 07 Y:2020 07 2020 CLEAN CONDENSER TUBES $4,023 $8,700 Implemented
UK2001 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $571 $875 Implemented
UK2001 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,887 $9,378 Implemented
UK2001 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,076 $2,010 Implemented
UK1511 # 04 Y:2015 04 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $596 $0 Implemented
UK1511 # 14 Y:2015 14 2015 INSULATE FEEDWATER TANK $1,113 $862 Implemented
UK1511 # 11 Y:2015 11 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $552 $0 Implemented
UK1511 # 09 Y:2015 09 2015 UPGRADE OBSOLETE EQUIPMENT $2,127 $14,000 Implemented
UK1511 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $737 $1,500 Implemented
UK1511 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,050 $0 Implemented
UK1511 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,159 $1,371 Implemented
UK1511 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,582 $51,370 Implemented
UK1511 # 03 Y:2015 03 2015 OPTIMIZE PLANT POWER FACTOR $9,011 $8,260 Implemented
UK1511 # 01 Y:2015 01 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $457,639 $1,000,000 Implemented
UD0348 # 05 Y:1991 05 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,580 $35,000 Implemented
UD0348 # 04 Y:1991 04 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,107 $100,000 Implemented
UD0348 # 03 Y:1991 03 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,159 $10,000 Implemented
UD0348 # 02 Y:1991 02 1991 OPTIMIZE PLANT POWER FACTOR $1,543 $1,500 Implemented
UD0348 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $5,557 $5,000 Implemented
TN0291 # 02 Y:1986 02 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $9,590 $1,809 Implemented
TN0291 # 07 Y:1986 07 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $557 $295 Implemented
TN0291 # 06 Y:1986 06 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,828 $375 Implemented
TN0291 # 05 Y:1986 05 1986 INSULATE BARE EQUIPMENT $2,828 $4,867 Implemented
TN0291 # 04 Y:1986 04 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $518 $0 Implemented