IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,375

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0407 # 01 Y:1993 01 1993 UPGRADE OBSOLETE EQUIPMENT $15,428 $3,583 Implemented
KU0407 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $3,653 $9,978 Not Implemented
KU0407 # 03 Y:1993 03 1993 DIRECT WARMEST AIR TO COMBUSTION INTAKE $986 $2,400 Not Implemented
KU0407 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,730 $200 Implemented
KU0407 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,620 $1,120 Implemented
KU0407 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $444 $563 Implemented
KU0407 # 07 Y:1993 07 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,611 $0 Not Implemented
ME0109 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $14,260 $2,500 Not Implemented
ME0109 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,215 $4,300 Not Implemented
ME0109 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,548 $4,674 Implemented
ME0109 # 04 Y:1993 04 1993 RECOVER WASTE HEAT FROM EQUIPMENT $5,450 $9,000 Not Implemented
GT0477 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,693 $8,240 Not Implemented
GT0477 # 02 Y:1992 02 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,233 $27,230 Not Implemented
GT0477 # 03 Y:1992 03 1992 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $140 $100 Not Implemented
GT0477 # 04 Y:1992 04 1992 HEAT WATER WITH EXHAUST HEAT $690 $1,490 Not Implemented
GT0477 # 05 Y:1992 05 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,470 $450 Not Implemented
GT0477 # 06 Y:1992 06 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,120 $550 Not Implemented
GT0477 # 07 Y:1992 07 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $330 $690 Not Implemented
GT0477 # 08 Y:1992 08 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,200 $6,500 Not Implemented
WI0160 # 01 Y:1992 01 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,410 $3,576 Not Implemented
WI0160 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,046 $500 Implemented
WI0160 # 03 Y:1992 03 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,080 $960 Not Implemented
WI0160 # 04 Y:1992 04 1992 RECOVER WASTE HEAT FROM EQUIPMENT $994 $1,200 Not Implemented
WI0160 # 05 Y:1992 05 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $463 $1,400 Not Implemented
WI0160 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $541 $0 Not Implemented