IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0583 # 07 Y:2017 07 2017 INSULATE FEEDWATER TANK $665 $1,106 Implemented
NC0583 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $6,456 $7,000 Not Implemented
NC0583 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,025 $200 Implemented
NC0583 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,519 $6,412 Implemented
NC0583 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $2,529 $5,865 Implemented
NC0583 # 01 Y:2017 01 2017 RECOVER WASTE HEAT FROM EQUIPMENT $61,111 $160,000 Not Implemented
NC0583 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,222 $100 Not Implemented
NC0075 # 04 Y:1995 04 1995 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $5,067 $8,000 Implemented
NC0075 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $482 $1,680 Not Implemented
NC0075 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,267 $1,710 Implemented
NC0075 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,682 $546 Implemented
NC0075 # 05 Y:1995 05 1995 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $72,500 $170,000 Implemented
NC0075 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $720 $200 Implemented
TN0394 # 02 Y:1990 02 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $5,454 $2,060 Implemented
TN0394 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,219 $1,000 Not Implemented
TN0394 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,298 $0 Implemented
TN0394 # 05 Y:1990 05 1990 INSULATE BARE EQUIPMENT $513 $565 Not Implemented
TN0394 # 06 Y:1990 06 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,838 $840 Implemented
TN0394 # 07 Y:1990 07 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $668 $1,963 Implemented
TN0394 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $451 $270 Implemented
TN0394 # 09 Y:1990 09 1990 INSULATE BARE EQUIPMENT $167 $459 Implemented
TN0394 # 01 Y:1990 01 1990 HEAT WATER WITH EXHAUST HEAT $54,274 $73,320 Not Implemented
AT0111 # 02 Y:1988 02 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $715 $0 Implemented
AT0111 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,057 $175 Implemented
AT0111 # 04 Y:1988 04 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $710 $665 Implemented