IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
SIC 2026 Fluid Milk
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0587 # 07 Y:2012 07 2012 Install Anaerobic Digester $75,601 $294,329 Not Implemented
OR0587 # 06 Y:2012 06 2012 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $7,810 $9,114 Not Implemented
OR0587 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $2,854 $2,854 Implemented
OR0587 # 04 Y:2012 04 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $3,099 $1,560 Not Implemented
OR0587 # 03 Y:2012 03 2012 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $15,142 $6,108 Not Implemented
OR0587 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,687 $1,000 Not Implemented
OR0587 # 01 Y:2012 01 2012 UPGRADE CONTROLS ON COMPRESSORS $11,403 $11,403 Not Implemented
OR0416 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $32,840 $32,942 Not Implemented
OR0416 # 07 Y:2002 07 2002 OPTIMIZE PLANT POWER FACTOR $15,524 $38,000 Not Implemented
OR0416 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,200 $0 Not Implemented
OR0416 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,862 $1,500 Not Implemented
OR0416 # 03 Y:2002 03 2002 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $13,308 $0 Not Implemented
OR0416 # 02 Y:2002 02 2002 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $19,366 $0 Not Implemented
OR0416 # 01 Y:2002 01 2002 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $140,000 $790,000 Not Implemented
OR0204 # 01 Y:1994 01 1994 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $11,122 $5,000 Implemented
OR0204 # 06 Y:1994 06 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $376 $1,075 Implemented
OR0204 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $2,378 $1,394 Implemented
OR0204 # 04 Y:1994 04 1994 OPTIMIZE PLANT POWER FACTOR $4,057 $5,100 Not Implemented
OR0204 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $7,860 $8,997 Implemented
OR0204 # 02 Y:1994 02 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $912 $3,000 Implemented