Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0215 # 04 Y:2016 | 04 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $567 | $0 | Not Implemented |
MZ0215 # 03 Y:2016 | 03 | 2016 | INSTALL OCCUPANCY SENSORS | $1,093 | $220 | Implemented |
MZ0215 # 02 Y:2016 | 02 | 2016 | INSULATE BARE EQUIPMENT | $2,514 | $1,500 | Implemented |
MZ0215 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,397 | $8,400 | Implemented |
MZ0155 # 04 Y:2014 | 04 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,228 | $750 | Not Implemented |
MZ0155 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,118 | $1,525 | Not Implemented |
MZ0155 # 01 Y:2014 | 01 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,080 | $1,350 | Not Implemented |
MZ0155 # 02 Y:2014 | 02 | 2014 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,171 | $1,000 | Not Implemented |
MZ0132 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,620 | $3,100 | Not Implemented |
MZ0132 # 08 Y:2013 | 08 | 2013 | REDUCE EXCESSIVE BOILER BLOWDOWN | $4,877 | $2,600 | Implemented |
MZ0132 # 03 Y:2013 | 03 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,256 | $4,000 | Not Implemented |
MZ0132 # 02 Y:2013 | 02 | 2013 | INCREASE AMOUNT OF CONDENSATE RETURNED | $28,581 | $40,000 | Implemented |
MZ0132 # 01 Y:2013 | 01 | 2013 | OPERATE BOILERS ON HIGH FIRE SETTING | $67,232 | $111,000 | Not Implemented |
MZ0132 # 15 Y:2013 | 15 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $791 | $1,000 | Implemented |
MZ0132 # 14 Y:2013 | 14 | 2013 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $865 | $635 | Implemented |
MZ0132 # 13 Y:2013 | 13 | 2013 | INSTALL OCCUPANCY SENSORS | $1,565 | $640 | Implemented |
MZ0132 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,108 | $1,630 | Implemented |
MZ0132 # 06 Y:2013 | 06 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,895 | $2,000 | Not Implemented |
MZ0132 # 10 Y:2013 | 10 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,050 | $925 | Not Implemented |
MZ0132 # 12 Y:2013 | 12 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,198 | $0 | Not Implemented |
MZ0132 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,152 | $12,430 | Implemented |
MZ0132 # 09 Y:2013 | 09 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,603 | $3,100 | Implemented |
MZ0132 # 11 Y:2013 | 11 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,911 | $1,030 | Not Implemented |
MO0278 # 05 Y:2000 | 05 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $3,000 | $0 | Implemented |
MO0278 # 06 Y:2000 | 06 | 2000 | AUTOMATE FINISHING PROCESS | $25,974 | $767 | Not Implemented |