Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,930
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0005 # 04 Y:1991 | 04 | 1991 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $24,575 | $13,000 | Not Implemented |
IA0005 # 05 Y:1991 | 05 | 1991 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,435 | $5,300 | Not Implemented |
WI0133 # 01 Y:1991 | 01 | 1991 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $13,543 | $0 | Implemented |
WI0133 # 02 Y:1991 | 02 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,875 | $3,000 | Implemented |
WI0133 # 03 Y:1991 | 03 | 1991 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,708 | $0 | Implemented |
WI0133 # 04 Y:1991 | 04 | 1991 | RECOVER WASTE HEAT FROM EQUIPMENT | $706 | $1,000 | Implemented |
WI0133 # 05 Y:1991 | 05 | 1991 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $452 | $800 | Implemented |
WI0133 # 06 Y:1991 | 06 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $429 | $200 | Implemented |
WI0133 # 07 Y:1991 | 07 | 1991 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $203 | $0 | Implemented |
WI0133 # 08 Y:1991 | 08 | 1991 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $91 | $236 | Implemented |
WI0127 # 01 Y:1991 | 01 | 1991 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $20,052 | $15,000 | Not Implemented |
WI0127 # 02 Y:1991 | 02 | 1991 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $12,150 | $7,000 | Not Implemented |
WI0127 # 03 Y:1991 | 03 | 1991 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $8,373 | $16,000 | Not Implemented |
WI0127 # 04 Y:1991 | 04 | 1991 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,042 | $2,560 | Not Implemented |
WI0127 # 05 Y:1991 | 05 | 1991 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,019 | $0 | Not Implemented |
WI0127 # 06 Y:1991 | 06 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $140 | $276 | Not Implemented |
WI0127 # 07 Y:1991 | 07 | 1991 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $389 | $283 | Not Implemented |
WI0127 # 08 Y:1991 | 08 | 1991 | INSTALL TIMERS AND/OR THERMOSTATS | $138 | $400 | Not Implemented |
WI0127 # 09 Y:1991 | 09 | 1991 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $917,100 | $0 | Not Implemented |
OR0127 # 01 Y:1991 | 01 | 1991 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $117 | $0 | Implemented |
OR0127 # 02 Y:1991 | 02 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23 | $0 | Implemented |
OR0127 # 03 Y:1991 | 03 | 1991 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $287 | $0 | Implemented |
OR0127 # 04 Y:1991 | 04 | 1991 | OPTIMIZE PLANT POWER FACTOR | $400 | $1,125 | Implemented |
OR0127 # 05 Y:1991 | 05 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $521 | $0 | Implemented |
OR0127 # 06 Y:1991 | 06 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $44 | $201 | Implemented |