Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,930
matching recommendationsSIC | 203 | Preserved Fruits And Vegetables |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0486 # 06 Y:2016 | 06 | 2016 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $21,035 | $22,499 | Not Implemented |
SF0486 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,334 | $11,830 | Implemented |
SF0486 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $15,444 | $46,053 | Implemented |
MZ0215 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,397 | $8,400 | Implemented |
MZ0215 # 02 Y:2016 | 02 | 2016 | INSULATE BARE EQUIPMENT | $2,514 | $1,500 | Implemented |
MZ0215 # 03 Y:2016 | 03 | 2016 | INSTALL OCCUPANCY SENSORS | $1,093 | $220 | Implemented |
MZ0215 # 04 Y:2016 | 04 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $567 | $0 | Not Implemented |
AM0705 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,470 | $5,000 | Implemented |
AM0705 # 02 Y:2016 | 02 | 2016 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $1,905 | $0 | Not Implemented |
AM0705 # 03 Y:2016 | 03 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,405 | $90 | Implemented |
AM0705 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,420 | $600 | Implemented |
AM0705 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,205 | $685 | Implemented |
AM0705 # 06 Y:2016 | 06 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $990 | $1,360 | Implemented |
AM0705 # 07 Y:2016 | 07 | 2016 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $760 | $0 | Not Implemented |
AM0705 # 08 Y:2016 | 08 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $540 | $7 | Implemented |
MI0287 # 01 Y:2015 | 01 | 2015 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $15,717 | $1,400 | Not Implemented |
MI0287 # 02 Y:2015 | 02 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $10,892 | $10,800 | Implemented |
MI0287 # 03 Y:2015 | 03 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,014 | $4,218 | Implemented |
MI0287 # 04 Y:2015 | 04 | 2015 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $5,439 | $160 | Not Implemented |
MI0287 # 05 Y:2015 | 05 | 2015 | USE OPTIMUM THICKNESS INSULATION | $2,395 | $8,535 | Not Implemented |
MI0287 # 06 Y:2015 | 06 | 2015 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,450 | $3,140 | Implemented |
MI0287 # 07 Y:2015 | 07 | 2015 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,047 | $280 | Not Implemented |
MI0287 # 08 Y:2015 | 08 | 2015 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $907 | $336 | Not Implemented |
MI0287 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $397 | $709 | Implemented |
MI0287 # 10 Y:2015 | 10 | 2015 | USE PHOTOCELL CONTROLS | $184 | $600 | Implemented |