IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0705 # 03 Y:2016 03 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,405 $90 Implemented
AM0705 # 08 Y:2016 08 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $540 $7 Implemented
AM0705 # 07 Y:2016 07 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $760 $0 Not Implemented
AM0705 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $990 $1,360 Implemented
AM0705 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,205 $685 Implemented
AM0705 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,420 $600 Implemented
AM0705 # 02 Y:2016 02 2016 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,905 $0 Not Implemented
AM0705 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,470 $5,000 Implemented
AM0620 # 04 Y:2012 04 2012 REPLACE BOILER $5,730 $30,000 Implemented
AM0620 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,900 $2,000 Implemented
AM0620 # 02 Y:2012 02 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,800 $0 Implemented
AM0620 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,660 $120 Implemented
AM0620 # 05 Y:2012 05 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,245 $54 Not Implemented
AM0620 # 06 Y:2012 06 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,965 $240 Implemented
AM0620 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,505 $750 Not Implemented
AM0620 # 08 Y:2012 08 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,390 $0 Implemented
AM0620 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,270 $3,290 Implemented
AM0620 # 10 Y:2012 10 2012 INSULATE BARE EQUIPMENT $1,030 $1,650 Implemented
AM0620 # 11 Y:2012 11 2012 USE SYNTHETIC LUBRICANT $515 $0 Not Implemented
AM0456 # 03 Y:2004 03 2004 REPAIR OR REPLACE STEAM TRAPS $6,850 $400 Implemented
AM0456 # 01 Y:2004 01 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $16,000 $16,900 Implemented
AM0456 # 08 Y:2004 08 2004 INSULATE BARE EQUIPMENT $790 $230 Not Implemented
AM0456 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $830 $15 Not Implemented
AM0456 # 02 Y:2004 02 2004 REPAIR AND ELIMINATE STEAM LEAKS $7,100 $500 Implemented
AM0456 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,870 $400 Implemented