IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,945

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OD0006 # 03 Y:1994 03 1994 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $190 $170 Implemented
OD0006 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $420 $380 Implemented
OD0006 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $887 $1,612 Implemented
OD0006 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,771 $6,574 Implemented
NV0003 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,929 $129 Not Implemented
NV0003 # 02 Y:1994 02 1994 INSTALL OCCUPANCY SENSORS $920 $180 Not Implemented
NV0003 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,340 $230 Not Implemented
NV0003 # 04 Y:1994 04 1994 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,818 $2,000 Not Implemented
NC0023 # 01 Y:1994 01 1994 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,130 $0 Not Implemented
NC0023 # 02 Y:1994 02 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $385 $770 Implemented
NC0023 # 03 Y:1994 03 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,610 $7,500 Not Implemented
NC0023 # 04 Y:1994 04 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $122,824 $35,000 Not Implemented
NC0023 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $72,336 $30,000 Not Implemented
NC0023 # 06 Y:1994 06 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $148,485 $65,000 Not Implemented
NC0023 # 07 Y:1994 07 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $297 $97 Not Implemented
OR0194 # 01 Y:1993 01 1993 KEEP BOILER TUBES CLEAN $23,338 $2,500 Implemented
OR0194 # 02 Y:1993 02 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $6,588 $2,790 Not Implemented
OR0194 # 03 Y:1993 03 1993 REDUCE FLUID FLOW RATES $17,513 $22,030 Implemented
OR0194 # 04 Y:1993 04 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,410 $9,422 Not Implemented
OR0194 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,934 $20,000 Implemented
OR0194 # 06 Y:1993 06 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,898 $11,300 Not Implemented
OR0194 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,962 $8,554 Not Implemented
OR0194 # 08 Y:1993 08 1993 OPTIMIZE PLANT POWER FACTOR $2,088 $6,000 Not Implemented
OR0193 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $29,170 $5,000 Implemented
OR0193 # 02 Y:1993 02 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,796 $0 Implemented