IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0264 # 11 Y:2025 11 2025 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $44,506 $432,000 n/a
UU0264 # 10 Y:2025 10 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $515 $916 n/a
UU0264 # 09 Y:2025 09 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $44,517 $717,537 n/a
UU0264 # 08 Y:2025 08 2025 INSTALL OCCUPANCY SENSORS $538 $1,531 n/a
UU0264 # 07 Y:2025 07 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,405 $8,915 n/a
UU0264 # 02 Y:2025 02 2025 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $215,672 $730,950 n/a
UU0264 # 01 Y:2025 01 2025 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM $79,422 $143,652 n/a
UU0264 # 03 Y:2025 03 2025 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $729,671 $3,645,455 n/a
UU0264 # 04 Y:2025 04 2025 REPLACE BOILER $379,077 $4,080,441 n/a
UU0264 # 05 Y:2025 05 2025 UPGRADE CONTROLS ON COMPRESSORS $3,332 $4,000 n/a
UU0264 # 06 Y:2025 06 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,905 $7,317 n/a
UU0236 # 01 Y:2024 01 2024 REPLACE BOILER $208,300 $1,070,720 Implemented
UU0236 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $5,640 $3,090 Implemented
UU0236 # 03 Y:2024 03 2024 INSULATE BARE EQUIPMENT $16,698 $11,570 Implemented
UU0236 # 02 Y:2024 02 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $72,320 $46,000 Implemented
BS0146 # 01 Y:2021 01 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,004 $1,690 Not Implemented
BS0146 # 05 Y:2021 05 2021 UPGRADE CONVEYORS $1,386 $1,888 Not Implemented
BS0146 # 04 Y:2021 04 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $992 $159 Not Implemented
BS0146 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $622 $1,174 Not Implemented
BS0146 # 02 Y:2021 02 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,336 $5,040 Not Implemented
BS0146 # 06 Y:2021 06 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $686 $972 Not Implemented
BS0142 # 02 Y:2020 02 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,550 $6,370 Not Implemented
BS0142 # 03 Y:2020 03 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,266 $1,811 Not Implemented
BS0142 # 05 Y:2020 05 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $888 $1,944 Not Implemented
BS0142 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $53 $75 Not Implemented