IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0037 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,719 $180 n/a
MU0037 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $65,091 $242,014 n/a
MU0037 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,677 $8,432 n/a
MU0037 # 05 Y:2023 05 2023 INCREASE AMOUNT OF CONDENSATE RETURNED $104,339 $0 n/a
MU0037 # 01 Y:2023 01 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $206,493 $9,224 n/a
UM0394 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,811 $5,000 Not Implemented
UM0394 # 05 Y:2011 05 2011 INSULATE BARE EQUIPMENT $1,971 $2,584 Implemented
UM0394 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,147 $200 Implemented
UM0394 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $4,589 $3,850 Not Implemented
UM0394 # 02 Y:2011 02 2011 UPGRADE CONTROLS ON COMPRESSORS $6,227 $12,120 Not Implemented
UM0394 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,893 $37,992 Not Implemented
UM0394 # 07 Y:2011 07 2011 INSTALL OCCUPANCY SENSORS $1,389 $1,350 Not Implemented
UM0394 # 08 Y:2011 08 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $180 $10 Not Implemented
UM0394 # 09 Y:2011 09 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,902 $10,000 Not Implemented
UM0318 # 08 Y:2007 08 2007 INSULATE BARE EQUIPMENT $766 $454 Not Implemented
UM0318 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,215 $75 Implemented
UM0318 # 06 Y:2007 06 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,516 $1,650 Not Implemented
UM0318 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,647 $120 Implemented
UM0318 # 04 Y:2007 04 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,947 $4,500 Implemented
UM0318 # 03 Y:2007 03 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,279 $0 Implemented
UM0318 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,573 $7,025 Not Implemented
UM0318 # 01 Y:2007 01 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,540 $14,000 Implemented
UM0092 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,616 $29,553 Not Implemented
UM0092 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $696 $1,000 Not Implemented
UM0092 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,141 $4,497 Not Implemented