Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 1997
Principal Product Potato Products
NAICS n/a
SIC 2037 - Frozen Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 214,307
Annual Production 114,000,000 Pounds
Production Hrs. Annual 7,056
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $624,095 17,648,887 kWh $0.04
Electricity Demand $84,811 36,084 kW-months/year $2.35
Electricity Fees $145,562 - $ -
Natural Gas $601,098 196,529 MMBtu $3.06
TOTAL ENERGY COSTS $1,536,366
RECOMMENDED SAVINGS* $297,606 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Product Electricity Usage Electricity Demand Natural Gas Administrative Changes Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,141
Cost:
$4,497
$2,276 77,081 $1,865 131 - - - - - - $2,276
77,081
kWh
$1,865
131
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,616
Cost:
$29,553
$3,927 145,369 $2,689 189 - - - - - - $3,927
145,369
kWh
$2,689
189
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$696
Cost:
$1,000
$382 12,896 $314 22 - - - - - - $382
12,896
kWh
$314
22
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$35,249
Cost:
$8,500
$25,096 760,844 $10,153 1,293 - - - - - - $25,096
760,844
kWh
$10,153
1,293
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,392
Cost:
$5,361
- - - - $1,392 464 - - - - -
-
kWh
-
-
kW-months/year
$1,392
464
MMBtu
-
-
$
-
-
$
06: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$245,000
Cost:
$10,000
- - - - - - $245,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$245,000
-
$
-
-
$
07: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$4,512
Cost:
$300
- - - - - - - - $4,512 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$4,512
-
$
TOTAL RECOMMENDED Savings:
$297,606
Cost:
$59,211
$31,681 996,190 $15,021 1,635 $1,392 464 $245,000 - $4,512 - $31,681
996,190
kWh
$15,021
1,635
kW-months/year
$1,392
464
MMBtu
$245,000
-
$
$4,512
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost