IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

14

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0259 # 01 Y:2024 01 2024 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $3,866,540 $17,885,484 n/a
UU0259 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $221,450 $2,473,450 n/a
UU0259 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $205,038 $1,865,253 n/a
UU0259 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $68,165 $110,030 n/a
UU0259 # 05 Y:2024 05 2024 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $53,643 $33,000 n/a
UU0259 # 06 Y:2024 06 2024 INSTALL COMMON HEADER ON COMPRESSORS $3,995 $9,200 n/a
UU0179 # 01 Y:2021 01 2021 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $72,600 $4,000 Not Implemented
UU0179 # 02 Y:2021 02 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $27,935 $2,000 Implemented
UU0179 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,891 $1,233 Not Implemented
UU0179 # 04 Y:2021 04 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,472 $8,300 Not Implemented
UU0179 # 05 Y:2021 05 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,131 $100 Implemented
UU0179 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,013 $6,614 Implemented
UU0179 # 07 Y:2021 07 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $617 $50 Not Implemented
UU0179 # 08 Y:2021 08 2021 INSULATE BARE EQUIPMENT $345 $747 Not Implemented