IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0133 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $203 $0 Implemented
IA0005 # 03 Y:1991 03 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,471 $0 Not Implemented
IA0005 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,463 $9,202 Not Implemented
IA0005 # 01 Y:1991 01 1991 HEAT WATER WITH EXHAUST HEAT $10,300 $25,000 Not Implemented
WI0133 # 08 Y:1991 08 1991 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $91 $236 Implemented
WI0133 # 04 Y:1991 04 1991 RECOVER WASTE HEAT FROM EQUIPMENT $706 $1,000 Implemented
WI0133 # 06 Y:1991 06 1991 INSTALL TIMERS AND/OR THERMOSTATS $429 $200 Implemented
WI0133 # 03 Y:1991 03 1991 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,708 $0 Implemented
WI0133 # 02 Y:1991 02 1991 RECOVER WASTE HEAT FROM EQUIPMENT $2,875 $3,000 Implemented
WI0133 # 01 Y:1991 01 1991 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,543 $0 Implemented
IA0005 # 04 Y:1991 04 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $24,575 $13,000 Not Implemented
IA0005 # 05 Y:1991 05 1991 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,435 $5,300 Not Implemented
WI0133 # 05 Y:1991 05 1991 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $452 $800 Implemented
OR0127 # 05 Y:1991 05 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $521 $0 Implemented
OR0127 # 04 Y:1991 04 1991 OPTIMIZE PLANT POWER FACTOR $400 $1,125 Implemented
OR0127 # 01 Y:1991 01 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $117 $0 Implemented
OR0127 # 03 Y:1991 03 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $287 $0 Implemented
OR0127 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23 $0 Implemented
OR0127 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $44 $201 Implemented
WI0127 # 08 Y:1991 08 1991 INSTALL TIMERS AND/OR THERMOSTATS $138 $400 Not Implemented
WI0127 # 07 Y:1991 07 1991 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $389 $283 Not Implemented
WI0127 # 01 Y:1991 01 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $20,052 $15,000 Not Implemented
WI0127 # 04 Y:1991 04 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,042 $2,560 Not Implemented
WI0127 # 02 Y:1991 02 1991 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $12,150 $7,000 Not Implemented
WI0127 # 03 Y:1991 03 1991 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $8,373 $16,000 Not Implemented