IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0426 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $114,014 $187,500 Not Implemented
SU0426 # 02 Y:2016 02 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,123 $1,486 Not Implemented
SU0426 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $6,669 $7,515 Implemented
SU0426 # 04 Y:2016 04 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,690 $110,000 Implemented
BS0079 # 01 Y:2016 01 2016 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,545 $6,216 Not Implemented
BS0079 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $154 $148 Implemented
BS0079 # 03 Y:2016 03 2016 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $232 $850 Not Implemented
SF0486 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $15,444 $46,053 Implemented
SF0486 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,334 $11,830 Implemented
SF0486 # 06 Y:2016 06 2016 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $21,035 $22,499 Not Implemented
SF0486 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $1,616 $1,456 Not Implemented
SF0486 # 04 Y:2016 04 2016 UPGRADE CONTROLS ON COMPRESSORS $60,071 $20,763 Implemented
SF0486 # 03 Y:2016 03 2016 INSTALL STEAM TRAP $59,001 $20,027 Not Implemented
SF0486 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,280 $0 Implemented
SF0486 # 01 Y:2016 01 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $833 $0 Implemented
MZ0215 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $1,093 $220 Implemented
MZ0215 # 04 Y:2016 04 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $567 $0 Not Implemented
MZ0215 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $2,514 $1,500 Implemented
MZ0215 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,397 $8,400 Implemented
AM0705 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,470 $5,000 Implemented
AM0705 # 07 Y:2016 07 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $760 $0 Not Implemented
AM0705 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $990 $1,360 Implemented
AM0705 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,205 $685 Implemented
AM0705 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,420 $600 Implemented
AM0705 # 03 Y:2016 03 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,405 $90 Implemented