IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

268

matching recommendations
Reset
SIC 2032 Canned Specialties
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0037 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,677 $8,432 n/a
MU0037 # 01 Y:2023 01 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $206,493 $9,224 n/a
MU0037 # 03 Y:2023 03 2023 INSULATE BARE EQUIPMENT $65,091 $242,014 n/a
MU0037 # 05 Y:2023 05 2023 INCREASE AMOUNT OF CONDENSATE RETURNED $104,339 $0 n/a
MU0037 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,719 $180 n/a
UU0179 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,013 $6,614 Implemented
UU0179 # 04 Y:2021 04 2021 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,472 $8,300 Not Implemented
UU0179 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,891 $1,233 Not Implemented
UU0179 # 08 Y:2021 08 2021 INSULATE BARE EQUIPMENT $345 $747 Not Implemented
UU0179 # 07 Y:2021 07 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $617 $50 Not Implemented
UU0179 # 05 Y:2021 05 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,131 $100 Implemented
UU0179 # 02 Y:2021 02 2021 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $27,935 $2,000 Implemented
UU0179 # 01 Y:2021 01 2021 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $72,600 $4,000 Not Implemented
OR0704 # 05 Y:2018 05 2018 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $12,192 $2,161 Not Implemented
OR0704 # 01 Y:2018 01 2018 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $510,333 $740,000 Not Implemented
OR0704 # 06 Y:2018 06 2018 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $5,586 $14,266 Not Implemented
OR0704 # 02 Y:2018 02 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $127,144 $201,450 Implemented
OR0704 # 04 Y:2018 04 2018 MINIMIZE WATER USAGE $28,545 $540 Not Implemented
OR0704 # 03 Y:2018 03 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $40,837 $72,155 Not Implemented
SU0426 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $114,014 $187,500 Not Implemented
SU0426 # 02 Y:2016 02 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,123 $1,486 Not Implemented
SU0426 # 04 Y:2016 04 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,690 $110,000 Implemented
SU0426 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $6,669 $7,515 Implemented
OR0655 # 09 Y:2015 09 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $2,480 $20,979 Not Implemented
OR0655 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $4,958 $7,816 Not Implemented