IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

909

matching recommendations
Reset
SIC 2033 Canned Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0243 # 04 Y:1995 04 1995 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,714 $2,108 Not Implemented
OR0243 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $278 $796 Implemented
SD0127 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,637 $5,890 Implemented
SD0127 # 02 Y:1995 02 1995 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $18,822 $32,000 Implemented
SD0127 # 03 Y:1995 03 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $914 $16 Implemented
SD0127 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,145 $7,922 Implemented
SD0127 # 05 Y:1995 05 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $11,158 $13,280 Implemented
SD0127 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $3,379 $2,569 Implemented
OR0235 # 01 Y:1995 01 1995 ADD AREA LIGHTING SWITCHES $2,089 $2,200 Implemented
OR0235 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,052 $2,592 Implemented
OR0235 # 03 Y:1995 03 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $250 $500 Implemented
OR0235 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $1,680 $4,000 Implemented
OR0235 # 05 Y:1995 05 1995 USE MULTIPLE-EFFECT EVAPORATORS $2,900 $9,500 Implemented
OR0235 # 06 Y:1995 06 1995 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,970 $8,500 Not Implemented
OK0457 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,236 $13,720 Not Implemented
OK0457 # 02 Y:1995 02 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $2,691 $64 Implemented
OK0457 # 03 Y:1995 03 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $1,741 $4,508 Implemented
OK0457 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $1,344 $3,612 Implemented
OK0457 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,224 $2,077 Implemented
OK0457 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $882 $2,480 Not Implemented
OK0457 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $199 $240 Implemented
OK0457 # 08 Y:1995 08 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $49 $76 Implemented
UL0115 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $472 $1,520 Not Implemented
UL0115 # 02 Y:1994 02 1994 COVER OPEN TANKS $583 $330 Implemented
UL0115 # 03 Y:1994 03 1994 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $4,013 $4,000 Implemented