IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

83

matching recommendations
Reset
SIC 2033 Canned Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0287 # 04 Y:2015 04 2015 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,439 $160 Not Implemented
MI0287 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $397 $709 Implemented
MI0287 # 08 Y:2015 08 2015 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $907 $336 Not Implemented
MI0287 # 07 Y:2015 07 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,047 $280 Not Implemented
MI0287 # 06 Y:2015 06 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,450 $3,140 Implemented
MI0287 # 05 Y:2015 05 2015 USE OPTIMUM THICKNESS INSULATION $2,395 $8,535 Not Implemented
MI0287 # 10 Y:2015 10 2015 USE PHOTOCELL CONTROLS $184 $600 Implemented
MI0287 # 02 Y:2015 02 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,892 $10,800 Implemented
MI0287 # 01 Y:2015 01 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $15,717 $1,400 Not Implemented
MI0287 # 03 Y:2015 03 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,014 $4,218 Implemented
MI0209 # 13 Y:2011 13 2011 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $7,944 $2,000 Not Implemented
MI0209 # 14 Y:2011 14 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $5,235 $3,450 Implemented
MI0209 # 12 Y:2011 12 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $13,268 $3,200 Implemented
MI0209 # 11 Y:2011 11 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $10,779 $45,345 Not Implemented
MI0209 # 10 Y:2011 10 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $22,382 $2,550 Not Implemented
MI0209 # 09 Y:2011 09 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $13,681 $50 Implemented
MI0209 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,599 $1,320 Implemented
MI0209 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,204 $29,679 Implemented
MI0209 # 06 Y:2011 06 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $107,940 $330,568 Implemented
MI0209 # 05 Y:2011 05 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $112,996 $1,950 Implemented
MI0209 # 04 Y:2011 04 2011 REPLACE TREATED WATER WITH WELL / SURFACE WATER $132,137 $500,000 Implemented
MI0209 # 03 Y:2011 03 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $192,436 $36,000 Not Implemented
MI0209 # 02 Y:2011 02 2011 HEAT WATER WITH EXHAUST HEAT $240,185 $30,000 Not Implemented
MI0209 # 01 Y:2011 01 2011 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $4,297,734 $3,000,000 Implemented
MI0209 # 15 Y:2011 15 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $3,926 $3,450 Implemented