Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
107
matching recommendationsSIC | 2034 | Dehydrated Fruits, Vegetables, Soups |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0400 # 05 Y:2007 | 05 | 2007 | KEEP EQUIPMENT CLEAN | $3,059 | $87 | Implemented |
UF0400 # 07 Y:2007 | 07 | 2007 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $653 | $511 | Not Implemented |
UF0400 # 08 Y:2007 | 08 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $111,825 | $230 | Not Implemented |
UF0400 # 02 Y:2007 | 02 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,731 | $0 | Not Implemented |
UF0400 # 03 Y:2007 | 03 | 2007 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $1,930 | $624 | Implemented |
UF0400 # 04 Y:2007 | 04 | 2007 | INSTALL OCCUPANCY SENSORS | $4,182 | $928 | Implemented |
UF0400 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,632 | $9,727 | Implemented |
UF0400 # 06 Y:2007 | 06 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,583 | $21,927 | Not Implemented |
OR0508 # 04 Y:2006 | 04 | 2006 | BURN A LESS EXPENSIVE GRADE OF FUEL | $375,000 | $480,000 | Not Implemented |
OR0508 # 02 Y:2006 | 02 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $53,000 | $2,000 | Implemented |
OR0508 # 03 Y:2006 | 03 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $24,700 | $5,000 | Implemented |
OR0508 # 01 Y:2006 | 01 | 2006 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $69,500 | $30,000 | Implemented |
OR0508 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,100 | $12,000 | Implemented |
OR0508 # 05 Y:2006 | 05 | 2006 | OPTIMIZE PLANT POWER FACTOR | $18,300 | $31,500 | Not Implemented |
OR0508 # 08 Y:2006 | 08 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $5,100 | $30,000 | Implemented |
OR0508 # 09 Y:2006 | 09 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,700 | $6,900 | Not Implemented |
OR0508 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,200 | $3,200 | Implemented |
SF0314 # 07 Y:2005 | 07 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,127 | $2,564 | Not Implemented |
SF0314 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $258 | $0 | Implemented |
SF0314 # 04 Y:2005 | 04 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,926 | $807 | Not Implemented |
SF0314 # 06 Y:2005 | 06 | 2005 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $20,484 | $30,250 | Not Implemented |
SF0314 # 11 Y:2005 | 11 | 2005 | USE LESS WASTEFUL PACKAGING | $2,285 | $0 | Not Implemented |
SF0314 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,186 | $14,112 | Not Implemented |
SF0314 # 01 Y:2005 | 01 | 2005 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $4,353 | $0 | Implemented |
SF0314 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $447 | $2,408 | Not Implemented |